04-27-2023, 02:29 PM
For the price tag they're putting on it, I'd expect more than a shitty surface running LRT system with the tracks split up yet again. 4.5+ billion should be enough for an entire elevated metro or subway system. But this is Waterloo Region so I'm sure they'll find a way to screw it up and build the worst possible option available, should it ever get built.