Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 2 Vote(s) - 4.5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION Phase 2 - Cambridge's Light Rail Transit
One element of cost escalation was given above: rail-rail grade separation. There is no non-artificial reason why the LRT can’t cross the rail line in the same way as a bus, or with the benefit of a signal interlocking. Either way, access to the diamond is controlled such that the chance of a train and an LRT both trying to occupy it at the same time is reduced to very close to zero. It’s only a form of safety paranoia that makes us unable to build an LRT system with a level crossing of a freight line.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION Phase 2 - Cambridge's Light Rail Transit - by ijmorlan - 04-25-2023, 12:13 AM

Forum Jump:


Users browsing this thread: 47 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links