(04-10-2023, 02:07 PM)cherrypark Wrote: Is there a rail alignment that would enable them to still transport LRVs to the KW ION section and O&M facilities without connecting the two? To me, it seems like so much of the cost is bridging (literally and figuratively) the space between KW and Cambridge with the Preston/Eagle St. mess in the middle making it worse.
Though one would want to eventually connect them, is there an alternate reality where Hespeler - Cambridge North - Galt is its own leg of LRT with a BRT in the middle? I imagine the crossing at the Grand plus all the elevated sections between Fairview and Pinebush are much of this cost escalation, while I don't really understand if the passengers going from Cambridge to Kitchener are really that large in number vs. their respective intracity stops. Just seems like a huge amount of cost, if it were that much, vs. the relative utility of building another 1-2 alignments in K-W and making something more flexible to link Cambridge.
I don't think this cost escalation has anything to do with what we're building or where...and everything to do with how we build...namely...wastefully and unnecessarily.
It's the same thing with the transit station...
I honestly don't know what to do...if we are unwilling or unable to actually fix these problems...then our society is pretty much over.