04-08-2023, 02:38 PM
(04-07-2023, 09:32 PM)tomh009 Wrote:(04-07-2023, 05:39 PM)Bytor Wrote: Option A in the report is Fairway to Pinebush only. The previous roughly $1.2B cost estimate was for the construction of the entire length, option C in this report. So you can't really compare them like that and say Option A is a 20% increase from previous.
Was that the same route, though?
No. Option A is not the same as what was originally projected as somewhere between $1.2B and $1.5B.
Option A is only about one-third of the Stage 2 route endorsed back in 2019.