(04-07-2023, 05:39 PM)Bytor Wrote:(04-07-2023, 02:28 PM)tomh009 Wrote: If you look at the chart on the previous page, you will see the route A option at $1.8M (top left figure), a roughly 20% increase from the pre-pandemic estimate.
Option A in the report is Fairway to Pinebush only. The previous roughly $1.2B cost estimate was for the construction of the entire length, option C in this report. So you can't really compare them like that and say Option A is a 20% increase from previous.
Was that the same route, though?