09-14-2022, 08:29 PM
Work on the Joseph St reconstruction (including adding a MUT) has started.
Last I checked on Stewart St some of the new curbs were in, though the trees still remained were the MUT is going. I'm sure the construction drawings showed it, but all of the trees there are sadly clearly coming down.
Last I checked on Stewart St some of the new curbs were in, though the trees still remained were the MUT is going. I'm sure the construction drawings showed it, but all of the trees there are sadly clearly coming down.