Joseph Street and Stewart St reconstruction to start soon:
I hope we won't be waiting ages on the connection between Joseph and Stewart (or at least that it will be traversable in the meantime).
Photos below for the transit hub trail as of today. Some notes:
1) There is chain link fence or retaining wall boxing you in from both sides for almost the entire length
2) The 90 degree turn at King got a lot of attention, but it's not even the only one. There is another sharp turn on the downhill that takes you parallel to King St. The fence is not installed there yet, so I could have gone flying off
3) I don't recall seeing white paint marking the edge of a trail elsewhere in the region, and it even seems used to steer you around light posts that are on the paved surface.
Quote:Thank you for subscribing for updates on the road reconstruction taking place on Joseph Street and Stewart Street: Victoria Street South to north end and Park Street East to end.
We are sending this message to let you know that construction begins July 4, 2022. The contractor will prepare the construction site that day. They will then install a temporary watermain during the first week.
I hope we won't be waiting ages on the connection between Joseph and Stewart (or at least that it will be traversable in the meantime).
Photos below for the transit hub trail as of today. Some notes:
1) There is chain link fence or retaining wall boxing you in from both sides for almost the entire length
2) The 90 degree turn at King got a lot of attention, but it's not even the only one. There is another sharp turn on the downhill that takes you parallel to King St. The fence is not installed there yet, so I could have gone flying off
3) I don't recall seeing white paint marking the edge of a trail elsewhere in the region, and it even seems used to steer you around light posts that are on the paved surface.