Metrolinx outlines the major works on page 45:
It seems to me looking at that that Metrolinx will likely be starting work on a second platform in Guelph based on work they did last fall which would fall under the 2WAD and the land acquisitions strongly suggest they intend to proceed with the rail-rail grade separation. Regardless, they are doing stuff beyond the BAU scenario.
It seems to me looking at that that Metrolinx will likely be starting work on a second platform in Guelph based on work they did last fall which would fall under the 2WAD and the land acquisitions strongly suggest they intend to proceed with the rail-rail grade separation. Regardless, they are doing stuff beyond the BAU scenario.