In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
So we have all the trains -- could someone update us on which of the trains now have the Grandlinx equipment installed?
Reply


(12-07-2018, 10:59 AM)tomh009 Wrote: So we have all the trains -- could someone update us on which of the trains now have the Grandlinx equipment installed?

Could the answer be "all of them" (though we have no confirmation)? The last communication was that we had not signed off on preliminary acceptance on any of them though.
Reply
I think 502-508 were having it installed in Waterloo, so if any don't have it they'll be in that batch.
Reply
Reply
That looks like a print on a common mass produced shirt based off the tag.
Reply
(12-07-2018, 01:38 PM)KevinL Wrote: I think 502-508 were having it installed in Waterloo, so if any don't have it they'll be in that batch.

Also 509.
Reply
(12-07-2018, 10:59 AM)tomh009 Wrote: So we have all the trains -- could someone update us on which of the trains now have the Grandlinx equipment installed?

From the last report on November 6th, I think that 505 to 509 still need the equipment.  Yet I heard on the radio that 508 was out a few days ago?
Reply


(12-07-2018, 10:28 PM)Square Wrote:
(12-07-2018, 10:59 AM)tomh009 Wrote: So we have all the trains -- could someone update us on which of the trains now have the Grandlinx equipment installed?

From the last report on November 6th, I think that 505 to 509 still need the equipment.  Yet I heard on the radio that 508 was out a few days ago?

They don’t need the FIE in order to operate; just to operate service in the fashion that is planned. So depending on what sort of testing they are doing, they might still be able to use FIE-non-equipped vehicles.
Reply
A lot of the testing of late has been operator training, much of which could be accomplished in non FIE equipped vehicles while the early FIE checkout and debug was done with just 511. In the last two or three days I've only been hearing the 'delivered with FIE' fleet on the radio (510 through 513), so hopefully 505 through 509 are getting their's installed now.
...K
Reply
Thank you for the replies. Just caught me by surprise that 508 came out. Maybe testing out some equipment? I think this vehicle was waiting for parts?
Reply
Just in case anyone is looking to catch some LRV action today, both 511 and 512 are out. One is leaving Fairway heading North, the other is somewhere around Mill, heading South.

There is trackwork going on (Railterm) between Northfield and Erb/Caroline, so I'm not sure what the plan is for today (either just testing at the South end of the alignment, using a crossover to short turn, or reverse-run past the Railterm folks).
Reply
(12-08-2018, 10:32 AM)Canard Wrote: Just in case anyone is looking to catch some LRV action today, both 511 and 512 are out.  One is leaving Fairway heading North, the other is somewhere around Mill, heading South.

There is trackwork going on (Railterm) between Northfield and Erb/Caroline, so I'm not sure what the plan is for today (either just testing at the South end of the alignment, using a crossover to short turn, or reverse-run past the Railterm folks).
They pulled down the decorations from 511 yesterday after their Christkindle train visit. I r disappoint Tongue
Reply
Oh no!

But at least you still have 511's "13" adhesive residue!
Reply


Testing is going to get interesting in the near future. Bombardier has a bunch more proof-of-concept testing they want to do here once they are done doing the same stuff in Kingston.
Reply
(12-08-2018, 11:31 AM)trainspotter139 Wrote: Testing is going to get interesting in the near future. Bombardier has a bunch more proof-of-concept testing they want to do here once they are done doing the same stuff in Kingston.

Forgive the potentially silly question, but what is this?
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 45 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links