(10-26-2018, 10:59 PM)Canard Wrote: It's amazing what a story there is behind that little square, and just how much trouble it has caused between so many parties.
I've seen reference to that spot a hundred times, and I've never asked....what's supposed to be there???
Posts: 4,618
Threads: 16
Joined: Aug 2014
Reputation:
153
(10-28-2018, 09:54 PM)Spokes Wrote: (10-26-2018, 10:59 PM)Canard Wrote: It's amazing what a story there is behind that little square, and just how much trouble it has caused between so many parties.
I've seen reference to that spot a hundred times, and I've never asked....what's supposed to be there???
The 'specialist equipment' that has been the centre of a lot of discussion in the past several months. The control components that Bombardier does not supply, because they interact with the trackside systems (signaling, etc).
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
...and more specifically, who was supposed to supply said equipment, and when.
...but, y’know, It’s All Bombardier’s Fault™️.
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
It makes me wonder why none of the local reporters have stopped ask themselves "why is the specialized equipment only being installed now when have been receiving fully assembled vehicles for over a year now?"
Everyone move to the back of the bus and we all get home faster.
Posts: 609
Threads: 0
Joined: Nov 2016
Reputation:
79
(10-29-2018, 10:50 AM)Pheidippides Wrote: It makes me wonder why none of the local reporters have stopped ask themselves "why is the specialized equipment only being installed now when have been receiving fully assembled vehicles for over a year now?"
Last December I sent an e-mail to Ben Spurr, transportation writer at The Star, to ask if he could dig into it since he's done a number of well researched pieces on Bombardier, the TTC, and Metrolinx. Presumably he has the sources to come up with something good, and while I know he covers the GTA I thought that with the Metrolinx angle and a bunch of Star subscribers in our region he might just go for it anyway. He didn't take the bait, I didn't even get a reply. Unfortunately there's not a local reporter I have enough trust in to do the proper level of research.
...K
Posts: 1,709
Threads: 2
Joined: Aug 2014
Reputation:
35
What, you don't think Jeff Outhit would love to do a deep dive into this?
Posts: 4,938
Threads: 155
Joined: Aug 2014
Reputation:
128
(10-29-2018, 10:50 AM)Pheidippides Wrote: It makes me wonder why none of the local reporters have stopped ask themselves "why is the specialized equipment only being installed now when have been receiving fully assembled vehicles for over a year now?"
I think you're giving local reporters FAR too much credit.
Posts: 779
Threads: 2
Joined: Oct 2014
Reputation:
44
We got some evening train movements! Still no sign of all the vehicles that should have the specialized equipment here(not counting 511)
Posts: 1,096
Threads: 2
Joined: Aug 2014
Reputation:
33
Saw 505 heading south at Laurier Waterloo Park around 640
Posts: 609
Threads: 0
Joined: Nov 2016
Reputation:
79
10-29-2018, 07:20 PM
(This post was last modified: 10-29-2018, 07:23 PM by KevinT.)
(10-29-2018, 06:37 PM)Square Wrote: We got some evening train movements! Still no sign of all the vehicles that should have the specialized equipment here(not counting 511) 
The more you try to debug at once the harder it is. As disheartening as it feels to us, the smart thing is for them to debug the trackside communications systems and software with just 511's equipment, then roll out the rest when there's no more bugs to be found with it.
...K
Posts: 668
Threads: 0
Joined: Feb 2017
Reputation:
26
(10-29-2018, 07:20 PM)KevinT Wrote: (10-29-2018, 06:37 PM)Square Wrote: We got some evening train movements! Still no sign of all the vehicles that should have the specialized equipment here(not counting 511) 
The more you try to debug at once the harder it is. As disheartening as it feels to us, the smart thing is for them to debug the trackside communications systems and software with just 511's equipment, then roll out the rest when there's no more bugs to be found with it.
This... You really don't want 6 trains disabled by the equipment all at the same time.
Posts: 779
Threads: 2
Joined: Oct 2014
Reputation:
44
Thank you for the replies. Just the longer it takes, I get sad that the December start is in jeopardy. They will still have to equip 5 more vehicles here (505-509)
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Posts: 609
Threads: 0
Joined: Nov 2016
Reputation:
79
More night testing footage. So shiny!
...K
Posts: 668
Threads: 0
Joined: Feb 2017
Reputation:
26
10-30-2018, 02:46 AM
(This post was last modified: 10-30-2018, 02:57 AM by trainspotter139.)
(10-30-2018, 12:09 AM)KevinT Wrote: More night testing footage. So shiny!
I was wondering how long it would take before they did their night training. This new step forward opens a whole lot of time for them to do testing
Edit: maybe too shiny. Perhaps we should have gone with a matte finish instead lest we blind those with astigmatism (like myself) with all that shiny.
|