Posts: 1,206
Threads: 0
Joined: Mar 2015
Reputation:
37
They've now laid sod around the Laurel Trail crossing at University Avenue. That includes the area around the pole on the north side where the push button is. So I guess they're not going to put concrete there after all.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
I've never had an issue with that crossing. Push button, cross.
Posts: 7,847
Threads: 37
Joined: Jun 2016
Reputation:
218
Yes, right now during the busiest times people are often lined up over the tracks waiting to cross from the south side. That will be a problem when the trains are running. The north side isn't as bad, but still has some pretty problematic pedestrian/cyclist congestion. The mud that will ensue from putting the button away from concrete is only the beginning.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Why is the refuge island not aligned with the trail?
That is fantastic though to see a full MUT on both sides of the road through here!
Posts: 140
Threads: 2
Joined: Jan 2015
Reputation:
8
My guess is there's a minimum length required for the left turn lane onto Hazelglen.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
I have a bit of a sad story about the trail between Mill Park Drive and Old Mill Place in Kitchener, by the Wastewater Treatment Plant (behind Doon).
I had vented my frustrations earlier this year when I noted that signage there said construction along the closed trail was to be complete in 2016, only to find that it was still blocked off with a huge "NO TRESSPASSING" sign and fence in Spring 2017.
Regional staff told me that it would be reopened in June.
On my way home from work today, I thought I'd give the trail a try, instead of staying on the road, and see if it was actually open. The South end where it meets Old Mill Place was barred with a temporary barrier and a sign, saying it was closed... I noticed that this barrier went up after the flooding a few weeks ago.
Right as I was about to keep moving on (and not go down it), a very out-of-breath cyclist came up out of there. I asked her if it was passable, and she said no, not really. She said "But I saw a sign at the other end... that said construction was in 2016!!" before she could even finish her sentence my heart just sank.
She was somewhat distressed and I could see her bike was in really rough shape, and she was looking for help at the College (hospice?), so I helped give her directions and she went off on her way.
But it just really made me sad and upset that, here's someone a little less fortunate who was relying on infrastructure to get where she needed to go... and it totally failed her.