I love the idea of doing the intersections first - I think it's brilliant, personally. If there are tight enough curves in between the intersections that there are pre-rolled rail sections there anyway (rather than long strings of ribbon rail, like further south on Charles with gentle curves), there is no penalty to doing this - only benefit.
Posts: 419
Threads: 1
Joined: Jun 2015
Reputation:
32
(07-20-2016, 10:30 PM)Waterlooer Wrote: Hmm, if this is north of the freight line crossing King, and this needs to be investigated, I'd hope that it wouldn't effect the main Uptown ION construction south of the fright line.
It is north of the freight line ( streetview). Hard to figure out which way it lies to see if it gets close enough to the freight line for it to be a concern for CN or just for the utility relocation (which I assume is the only reason we're digging there in the first place?).
Posts: 1,709
Threads: 2
Joined: Aug 2014
Reputation:
34
Regardless, a camera drone or rover would be great footage for the team to post.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
07-21-2016, 02:49 PM
(This post was last modified: 07-21-2016, 02:49 PM by Canard.)
Meanwhile, in Ottawa:
<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">We're bringing electric trains back to <a href="https://twitter.com/hashtag/OttCity?src=hash">#OttCity</a>. So exciting! <a href="https://twitter.com/hashtag/OttLRT?src=hash">#OttLRT</a> <a href="https://twitter.com/hashtag/TBT?src=hash">#TBT</a> <a href="https://twitter.com/hashtag/OnTrack2018?src=hash">#OnTrack2018</a> <a href="https://t.co/w38XQC2Xv6">pic.twitter.com/w38XQC2Xv6</a></p>— City of Ottawa (@ottawacity) <a href="https://twitter.com/ottawacity/status/756188296527671297">July 21, 2016</a></blockquote>
Totes jelly!
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Happening meow!
<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">Meet the newest member of the TPSS Family! This little guy will call home Block Line at Courtland. <a href="https://twitter.com/rideIONrt">@rideIONrt</a> <a href="https://twitter.com/hashtag/wrLRT?src=hash">#wrLRT</a> <a href="https://t.co/rlXiSpXmiH">pic.twitter.com/rlXiSpXmiH</a></p>— iain (@Canardiain) <a href="https://twitter.com/Canardiain/status/756244301315727360">July 21, 2016</a></blockquote>
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
Throw a little bit of asphalt in there, and we'll be just about ready to reopen!
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
Walked along the line from King and Willis to Duke and Frederick this morning.
Activity was concentrated
-on King between Union and John with concrete pouring of the NB track
-at King and Moore with an even deeper hole now
-on Francis between King and Duke with concrete pouring
-at Victoria and Charles
Everyone move to the back of the bus and we all get home faster.
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
Everyone move to the back of the bus and we all get home faster.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Awesome photos! As always, I am so envious of those who get to see the daytime activities. Stupid work.
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
Just realised Ottawa / Charles is supposed to reopen next Tuesday! Anyone been out there recently? I'm assuming the track must at least be PLACED by now, if not embedded.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Will let you know in a few hours!
Posts: 1,709
Threads: 2
Joined: Aug 2014
Reputation:
34
Track is now embedded from Water/Duke to Duke/Beer Store.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Posts: 6,491
Threads: 38
Joined: Aug 2014
Reputation:
88
It would involve both Duke and Francis, I believe.