Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 3 Vote(s) - 3.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
King-Victoria Transit Hub
At this point, I would take a modestly larger indoor area from transit drops to platform and shed style station platform if it meant a more upgraded version of this park. The proposal for the central station was so bare bones and with zero commercial inside, I don't even know what one would be spending much time in there for anyways... give me $100M closer to the next $1B of a Phrase 3 E-W ION line while Cambridge sorts themselves out.
Reply


(11-21-2024, 10:13 AM)cherrypark Wrote: At this point, I would take a modestly larger indoor area from transit drops to platform and shed style station platform if it meant a more upgraded version of this park. The proposal for the central station was so bare bones and with zero commercial inside, I don't even know what one would be spending much time in there for anyways... give me $100M closer to the next $1B of a Phrase 3 E-W ION line while Cambridge sorts themselves out.

Honestly, at this point, I'd take what we have for our suburban local train station here, no actual building, nothing, just convenient access, via tunnel, elevators, heated enclosures on the platform, a roof spanning most of the platform, great signage (in our case we also have extensive sheltered bike parking, but that's probably not necessary in Ontario yet). This would already be better than the existing train station which is hard to access, usually closed (and thus un-sheltered), and with limited signage and notification, at least for most users (who are using GO not Via). And the station here is like a couple of million dollars worth of work and materials.
Reply
At this point, just bring back the dome tent and be done with it.
Reply
(11-21-2024, 02:55 PM)kps Wrote: At this point, just bring back the dome tent and be done with it.

Damn! On point.
Reply
(11-21-2024, 02:55 PM)kps Wrote: At this point, just bring back the dome tent and be done with it.

Maybe this would be more appropriate

[Image: 40vwPBf.jpeg]
Reply
Heh at least it will be protected from the elements and warm in the winter!
Reply
(11-21-2024, 03:51 PM)dtkvictim Wrote: Maybe this would be more appropriate

[Image: 40vwPBf.jpeg]

Anyone else thinking future council chamber? Clancy playing Entry of the Gladiators on a quack pipe, Chapman doing circles on a unicycle while squeeking a big red clown nose, Vrbanovic being carried on a sedan chair by local Serbian mafia members and Owodunni doing something pointless...maybe some trampoline tricks or whatever.
Reply


Construction of Kitchener Central Transit Hub to begin in 2025
Work is expected to be finished by the end of 2029.

Construction of the Kitchener Central Transit Hub is expected to get underway next year, with planning approvals and several agreements in the works, including a memorandum of understanding with Metrolinx.

The timing is driven by Metrolinx’s construction schedule, and due to the complex nature of the project and adjacent construction sites, the sequencing of the work will be critical to successful delivery, states a report going to the region’s sustainability, infrastructure and development committee on Tuesday, when transportation staff will present an update.

https://www.therecord.com/news/waterloo-...934ba.html
Reply
(11-30-2024, 07:43 AM)LesPio Wrote: Construction of Kitchener Central Transit Hub to begin in 2025
Work is expected to be finished by the end of 2029.

Construction of the Kitchener Central Transit Hub is expected to get underway next year, with planning approvals and several agreements in the works, including a memorandum of understanding with Metrolinx.

The timing is driven by Metrolinx’s construction schedule, and due to the complex nature of the project and adjacent construction sites, the sequencing of the work will be critical to successful delivery, states a report going to the region’s sustainability, infrastructure and development committee on Tuesday, when transportation staff will present an update.

https://www.therecord.com/news/waterloo-...934ba.html

There is going to be a time in the near future where we are unable to construct so much as a parking lot.
Reply
https://www.therecord.com/news/waterloo-...934ba.html
Reply
5 years to construct. Ugh.

Engineers in the room - couldn't this conceivably be done in 2 to 3?
Reply
(11-30-2024, 03:16 PM)Momo26 Wrote: 5 years to construct.  Ugh.

Engineers in the room - couldn't this conceivably be done in 2 to 3?

Short answer is yes. However without being involved in this project I can't say the exact reasons.

It's entirely conceivable that they do the first phase which encompasses everything required for the station to be operational, so the platforms, bus loop, parking, King St Bridge, Victoria St reconstruction (assuming Ford doesn't get in the way) wait a bit and then do the actual building resulting in the entire project to encompass 5 years. After all we're dealing with Metrolinx and they can be difficult to work with.
Reply
Wow...just wow...lmfao.
Reply


(11-30-2024, 03:16 PM)Momo26 Wrote: 5 years to construct.  Ugh.

Engineers in the room - couldn't this conceivably be done in 2 to 3?

The building, yes, easily. But the streets, the railway interface and Metrolinx coordination make it far more complex.
Reply
Could it not be five years simply to spread the cost over a longer time period?
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 4 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links