Waterloo Region Connected
Louie Condos (Columbia St and Albert St) | 8 fl | Proposed - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: University Area (https://www.waterlooregionconnected.com/forumdisplay.php?fid=6)
+--- Thread: Louie Condos (Columbia St and Albert St) | 8 fl | Proposed (/showthread.php?tid=1582)

Pages: 1 2


RE: Louie Condos (Columbia St and Albert St) | 8 fl | Proposed - panamaniac - 04-29-2024

Penalties of what sort? Imposed by whom?


RE: Louie Condos (Columbia St and Albert St) | 8 fl | Proposed - ZEBuilder - 04-30-2024

(04-29-2024, 09:30 PM)nms Wrote: Will this property be subject to penalties for demolishing rental housing and not starting construction soon enough?

Waterloo and Kitchener both don't have rental replacement policies so there really is no way to penalize a developer for demolishing units and not building. Its similar to how there's no way for either city to penalize a developer for not starting construction after a ZBA/OPA application is approved.


RE: Louie Condos (Columbia St and Albert St) | 8 fl | Proposed - nms - 04-30-2024

Waterloo must have a policy because they were able to pressure the developer to build the tower on the Westmount Plaza site after the developer applied to demolish the small apartment buildings on Dietz Ave. I don't know if it only applies to certain properties (eg purchased after a certain date) or types of buildings (eg rental apartments).