05-09-2021, 12:05 PM
(05-09-2021, 11:43 AM)allknowing2012 Wrote:(05-08-2021, 04:47 PM)danbrotherston Wrote: Certainly this would make a large development infeasible, but something like a 3-6 story building as are present along King should be possible without much in the way of underground works.Across the street is 10-15 floors .. so there cant be too many restrictions.
Not necessarily. I don’t know the geology, but in the extreme case the Marsland Centre could be built on a huge rock while the parking lot is built on sediment from the creek.
As far as I know, nothing in town is built on bedrock, but it’s still possible that the parking lot is much less able to take a really large building than the other side of Erb St.