11-28-2014, 11:37 AM
(11-28-2014, 11:08 AM)tuanmai Wrote: I think there will be a delay in this project. The original plan was to get the condos 100% ready for occupation on September 1st, 2015.
It depends, at regular construction rates 9 months should be enough to finish a tower in this project. Look at the progress made in 256 Phillip St. in six months.
However at current Waterloo construction rates this will be finished in two years.