Icon 330 | 25 fl | U/C - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4) +--- Forum: University Area (https://www.waterlooregionconnected.com/forumdisplay.php?fid=6) +--- Thread: Icon 330 | 25 fl | U/C (/showthread.php?tid=18) |
Icon 330 | 25 fl | U/C - rangersfan - 08-25-2014 Icon 330
330 Phillip st, Waterloo http://iconwaterloo.com/ Developer: Rise Real Estate Architect: SRM Architects 2 25 floor mixed use buildings with 6 storey podiums. Primary use being residential with over 600 units. Commitee of the whole packet Site Plan Location Before RE: Icon 330 - rangersfan - 08-25-2014 Phillip and Columbia project the first to use Northdale guidelines March 15, 2013 | Paige Desmond | The Record |LINK Quote:WATERLOO — A massive development project at Phillip and Columbia streets is a sign of the future in Northdale, being the first designed to standards approved specifically for the neighbourhood. - rangersfan - 08-25-2014 Feb 12, 2014 Feb 13, 2014 Feb 19, 2014 May 18, 2014 August 12, 2014 August 25, 2014 Re: Icon 330 - Spokes - 08-25-2014 This one's changed a bit from it's first proposal. Still a good mix of suite styles though. 1, 2 and 3 bedrooms all with a den. Three 25 storey towers though rather than varying height. Don't love that. Obviously the density is good, but varying the height keeps things interesting. Re: Icon 330 - Spokes - 08-26-2014 rangersfan Wrote:Site Plan So based on this it looks like the two twin towers will be called Icon 330, and then there will be a separate project called Icon 145 behind it. Maybe entering off Columbia? Re: Icon 330 - rangersfan - 08-26-2014 It looks that way, I am working on a separate thread for that building since it appears to be enter construction later than phase I. Re: Icon 330 - rangersfan - 08-26-2014 Prior concepts being developed for this location: Re: Icon 330 - Spokes - 08-26-2014 That last image is definitely close to the current proposal of Icon 145/330. I like the larger street wall along Phillip in the new one though Re: Icon 330 - rangersfan - 09-23-2014 September 22, 2014 RE: Icon 330 - rangersfan - 10-22-2014 Oct 22, 2014 RE: Icon 330 - Spokes - 10-22-2014 Is this excavation right at street level or is it set back? RE: Icon 330 - rangersfan - 10-22-2014 The excavation is only a meter or so from the sidewalk. RE: Icon 330 - Spokes - 10-23-2014 Interesting. I got the impression Icon 145 would get started first. RE: Icon 330 - rangersfan - 10-27-2014 The land for Icon 145 has not been cleared yet. Looking at the project renders again compared to the site plan I am a bit confused. Do you think the towers will be as wide as they look in the render? RE: Icon 330 - Markster - 11-24-2014 There's been a tower crane on site since last week, and they are already into the process of laying lego forms. |