In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 8 Vote(s) - 4.38 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Charlie West (Charles & Gaukel) | 31 fl | Complete
They've started painting some of the pre-cast panels black. The render on http://charliewest.ca/ does show the black and white design, but I'm surprised to see that it's still happening. I'm curious if it'll be black and white, or black and concrete grey.

August 20th (next week Friday) is the first occupancy, some people already have the moving elevators booked for 5pm that day.

   
Reply


May be hard to see in the photo, but they've started painting other parts of the precast in a white/beige colour. It looks like all the precast panels on the building are getting painted to match the render.

   
Reply
Why wouldn't they have cast the panels in the correct colour to start with? It would surely last longer and cost less. Are there other issues with that approach?
Reply
Concrete is a fairly expensive thing to dye, so it's not usually done on a large scale.
Reply
(08-15-2021, 10:01 AM)ac3r Wrote: Concrete is a fairly expensive thing to dye, so it's not usually done on a large scale.

Ahhh ... I figured the labour cost would be lower, but maybe not. Or maybe more dye/paint will be required, and it adds more cost than the savings in labour.
Reply
Another problem with dying concrete is getting a consistent colour over multiple manufacturing runs. Very close quality control measures, which further bumps up the cost.
Reply
First occupancy happened today. Given how much of a construction site it still is I'm glad I won't be moving in for another few months. I don't think I'd be getting many deliveries with a maze like that to get to the front door.

   
Reply


Looks like the one corner has the full coat of black now, and the off-white adjacent.

   
Reply
Lower floors started occupancy August 20, but occupancy has been pushed back several months (into 2022) for much of the top half of the building.
Reply
(08-25-2021, 02:53 PM)jeremyroman Wrote: Lower floors started occupancy August 20, but occupancy has been pushed back several months (into 2022) for much of the top half of the building.

Yep, I'm March 7 final firm occupancy date on the 30th floor.
Reply
Worth the wait for sure! (Says the guy who doesn't have to wait, hang in there Taylor)
Reply
Thought this might be of interest to people. Apparently as a part of density bonusing Momentum agreed to a gallery space in the podium. The long narrow space marked as Unit 14 will be given over to KWAG, and will contain rotating art. The exterior wall will be full glass, so the art is displayed to those walking along Gaukel St (there's no interior access, except to KWAG staff).

   
Reply
Nice! That's a great idea to expand art in this region.
Reply


Excellent! And even better on a pedestrian street.
Reply
Looking north-ish from the roof of Charlie West. Even 1 Victoria looks pretty small from up here.

   

And looking west-ish from the 30th floor

   
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 19 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links