In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 12 Vote(s) - 4.25 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Duke Tower Kitchener | 39 fl | completed
(10-18-2019, 06:35 PM)jgsz Wrote: 2019-10-18

All of the basement is covered.  For some reason they took away part of the covered sidewalk on the Frederick Street side.
i saw them doing that to, could it have something to do with concrete or the crane?
Reply


Probably the specialised delivery of a particular item that needs extra clearance. Just a guess, mind you.
Reply
Not sure what's happening here today, but Frederick is closed between Duke and Weber. Plus there is a line of trucks down Duke to Scott and some on Frederick as well.
Reply
(10-21-2019, 07:56 AM)BruceAshe Wrote: Not sure what's happening here today, but Frederick is closed between Duke and Weber. Plus there is a line of trucks down Duke to Scott and some on Frederick as well.

Yikes.  They're ripping up Frederick Street.  Another road closure is not what this neighbourhood needs...

   
Reply
They ate tying in the water and sewage which is why they took down some of the hoarding
Reply
Hopefully not a long closure
Reply
(10-21-2019, 11:31 AM)Rainrider22 Wrote: They ate tying in the water and sewage which is why they took down some of the hoarding

That’s what it looks like.  Frederick is closed but only a small area was dug up.  They’re digging deeper close to the work site.
Reply


2019-10-23

Does anyone know what that tall white object is for?   Sewage and/or water?  It was erected on Monday when they started to dig up parts of Frederick.

   
Reply
It's a placing boom. Crane like structure to pump concrete instead of using a bucket. Pump will sit on the street and go through piping up the building.
Reply
Is there any specifics on the height of this building (in meters/feet) or at least an estimate? I tried to look but 46 pages is a lot to go through.
Reply
(10-25-2019, 06:58 PM)ac3r Wrote: Is there any specifics on the height of this building (in meters/feet) or at least an estimate? I tried to look but 46 pages is a lot to go through.

According to this link 128 meters.


https://www.emporis.com/city/102391/kitc...kyscrapers
Reply
(10-25-2019, 07:56 PM)Square Wrote:
(10-25-2019, 06:58 PM)ac3r Wrote: Is there any specifics on the height of this building (in meters/feet) or at least an estimate? I tried to look but 46 pages is a lot to go through.

According to this link 128 meters.


https://www.emporis.com/city/102391/kitc...kyscrapers

Thanks. I was curious as I wanted to visualize what this will look like once completed. This building is less than half a meter shy of 128 meters. The Duke Tower building is really going to dominate the skyline for quite a while.
Reply
(10-26-2019, 01:44 PM)ac3r Wrote:
(10-25-2019, 07:56 PM)Square Wrote: According to this link 128 meters.


https://www.emporis.com/city/102391/kitc...kyscrapers

Thanks. I was curious as I wanted to visualize what this will look like once completed. This building is less than half a meter shy of 128 meters. The Duke Tower building is really going to dominate the skyline for quite a while.
Well that building is a lot better looking the DTK. I wish kitchener could get Rotterdam quality buildings. Having said that the dtk will still have a significant presence on the skyline. Just wish it was of a bit better design.
Reply


Just noticed the ramp to the parking areas.  Cars come in off Frederick Street and head towards the church to the ramp.  You can also see the ramp going up by Duke Street.

   
Reply
(10-30-2019, 12:35 PM)jgsz Wrote: Just noticed the ramp to the parking areas.  Cars come in off Frederick Street and head towards the church to the ramp.  You can also see the ramp going up by Duke Street.
There is also a ramp to the underground parking lot off of duke st by the man door. I was able to see it by sticking my phone over the fence.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 25 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links