08-15-2025, 01:13 PM
Engage has an update from a couple of weeks ago. Seems like they are just testing the land. I imagine the sign you saw actually just said no access to the city parking lot via Joseph St (the open portion is still accessible from the other side).
https://www.engagewr.ca/brammyards/work-...evelopment
https://www.engagewr.ca/brammyards/work-...evelopment
Quote:We are currently working with an engineering consultant to complete the pre-design technical studies necessary for the redevelopment of Bramm Yards. This includes:
- Phase One Environmental Site Assessment
- Phase Two Environmental Site Assessment
- Hydrogeological Assessment with Limited Geotechnical Study
- Environmental Risk Assessment and/or Remediation, including Record of Site Conditions
These studies will:
- Archaeological Assessment
- Check the site for any environmental issues (like soil or groundwater contamination)
- Assess the ground and water conditions
- Assess any risks like contamination and plan for cleanup if needed
Engineering work started on site in June 2025 and will continue through 2026. During this time, you might see:
- Check for anything of historical or archaeological importance
Access to the City parking lot will remain open to monthly customers.
- Drilling equipment
- Surveying or sampling tools
- Workers in safety vests
- Temporary markers or fencing in certain areas


