In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
University of Waterloo Math 4 | 5fl | Proposed
#16
(02-09-2021, 12:43 AM)nms Wrote: I expect one challenge with building over that laneway is the large loading dock in the NE corner of MC. Any building over the laneway would need to accommodate the highest likely delivery truck and/or garbage truck.
The parking spots along that stretch of lane are generally all accessible parking spots.

Manulife handles that in DTK. It just means the height needs to be enough to accommodate those trucks.
Reply


#17
(02-09-2021, 12:43 AM)nms Wrote: I expect one challenge with building over that laneway is the large loading dock in the NE corner of MC. Any building over the laneway would need to accommodate the highest likely delivery truck and/or garbage truck.
The parking spots along that stretch of lane are generally all accessible parking spots.

While there are many wheelchair spaces on that laneway, is by no means all, and by my count is in fact, less than half.

Honestly, I'd like to eliminate traffic on Ring Rd. for safety...but that's a whole other story.

The only way they could build it over the laneway is if the building's connected and the loading dock was moved. Feasible I think, but more ambitious and restrictive to be sure.
Reply
#18
Construction is supposed to begin at the end of this year:

https://uwaterloo.ca/math/mathematics-4

The page says that “the building is scheduled to be completed in 2025”. We’ll see.
Reply
#19
In an echo of Environment 3, this building will be built on top of and reuse the food court wing of DC. At 142,000 gross square feet and 5 storeys, it's not a small building.
Reply
#20
Definitely a better design than first discussed; the existing quad is kept in full, and is just enclosed more at the northeast. Very nice.
Reply
#21
The university has quietly been working on this behind the scenes but mobilization is now starting. The project manager appears to be Gillam, they have it up on their website. The building permit is valued at around 90 million dollars.

The university is expecting completion of this by December 2026 allowing M4 to be used for the Winter 2027 term.

Over the last few weeks very preliminary works started, fencing went up through the DC Quad a couple of weeks ago, the paths are still open as of today but once mobilization is complete the DC Quad will be the staging area so the paths in the Quad should be closing soon. Early this week the trees that are around the wing of DC where M4 is going to go came down making the space feel extremely empty. They have also been excavating a few holes around DC over the last two days in what looks like some kind of investigative work as to actual depths of pipes/fiber optics.

Today they brought in the site trailer which is parked by the DC exit closest to Ring Road by William Tutte Way. That entrance will be closed once construction starts, the bike racks by that DC entrance have signs saying these racks will be removed as of October 28th. There is nothing mentioned in the parking areas yet but along Ring Road where the bus laybys are in front of DC they have marked new parking spots and made curb cuts for accessible spaces.

Here's a really crappy picture I got of the site trailer while I was walking by which is the only photo worthy part of the site as of today.
   
Reply
#22
Since they mobilized they have installed various new pieces of underground infrastructure, they have installed new storm sewer throughout the site, they have watermain sitting on site as well as more manholes, from the looks of the manholes left it's for more storm infrastructure since most of them say CBMH (Catch Basin Manhole).

They have also started the demolition of the MC/DC bridge and MC/DC to M3 bridge connection. Cladding was taken off slowly over the last week next to DC as well as the underside of the M3 bridge.

   
Reply


#23
Haha nice and safe mini-ex on the roof
Reply
#24
Lol I didn't even notice that. Might seem unsafe, but those things don't weigh much. Totally safe to have up there unless someone manages to drive it off by accident.
Reply
#25
Haha yeah and I was picturing the walk to the seat!
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 2 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links