In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 5 Vote(s) - 3 Average
  • 1
  • 2
  • 3
  • 4
  • 5
TEK Tower (30 Francis) | 45 fl | U/C
Construction elevator has gone up and the final pieces of the pre-cast cladding on the podium are going up. They look to be on floor 16/17:

[Image: 4YxVp32.jpeg][Image: HuaMabN.jpeg]
Reply


Photo 
My regular update wasn't until next week, but in case U-Haul moves back in the way, here's one from today. Crane got taller, right?

[Image: VLijX0n.jpg]
Reply
Definitely taller now. For the engineers or builders on this forum, can you please explain to me why some buildings have the crane on the outside and other buildings have it on the inside ? It is my understanding that when the crane is setup inside, the crane crawls up the building so you don't need as many tower sections.
Reply
My first guess would be for the boom reach to compensate for the fact that podium is so large and they're also pulling up supplies from all sides of the project due to the limited amount of space they are needing to work with. It's probably just easier.
Reply
That makes sense. Thanks
Reply
We could start seeing window wall/glazing any day now
Reply
(06-15-2024, 07:59 AM)Rainrider22 Wrote: That makes sense.  Thanks

Don't quote me, though! I know nothing about cranes, that was just my first guess haha.
Reply


Lol well, seems reasonable
Reply
If you have the tower crane inside the building then there's a hole for it in every floor that needs to be filled in later. Maybe that's worth it to avoid by putting it outside.
Reply
(06-16-2024, 08:28 PM)mastermind Wrote: If you have the tower crane inside the building then there's a hole for it in every floor that needs to be filled in later.  Maybe that's worth it to avoid by putting it outside.

When it is installed inside they typically install the crane in the elevator core. So they don't need to fill anything in.
Reply
Photo 
June 28th. Almost finished the podium wrap on all sides.

[Image: 7xXeVfc.jpg]
Reply
From this angle it looks pretty good ... how it will look from the street (when completed) is still TBD.
Reply
(06-28-2024, 03:41 PM)tomh009 Wrote: From this angle it looks pretty good ... how it will look from the street (when completed) is still TBD.

I’m interested to see how it looks once windows and other exterior cladding starts going up
Reply


IN8 isn't gr8, but they sure work efficiently. They'll have built a whole skyscraper in the time it took Drewlo to dig a hole.
Reply
Glass installation has started on the King and a Francis Green side of the building. Couldn’t snap a pic of it however
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 5 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links