12-13-2020, 09:35 PM
(12-13-2020, 06:15 PM)Acitta Wrote:(12-13-2020, 05:16 PM)tomh009 Wrote: Here is their overall site concept and a rough timeline. Assuming things stay on track, by 2023, we should already have something resembling a neighbourhood, even if many buildings will remain to be built.Given that the demolition was unexpectedly stopped for a year, I think that any dates on that presentation are probably pushed back by at least that much.
Quite right. So, the construction of the mid-rise A/B/C buildings and the high-rise D should start next year. 2022-2023 should see the construction of the commercial area near Courtland and Borden. And by 2024 things should look pretty good.
Maybe!