12-13-2020, 05:16 PM
(12-01-2020, 10:00 PM)ac3r Wrote: Another decade long Auburn hole in the ground - yay...
Here is their overall site concept and a rough timeline. Assuming things stay on track, by 2023, we should already have something resembling a neighbourhood, even if many buildings will remain to be built.
The full presentation is here:
https://www.kitchener.ca/en/resourcesGen...e-Metz.pdf