09-16-2014, 08:13 AM
Spokes Wrote:That's great news that this is going forward. I still haven't seen anything from the city about this one though.There's not much to see - the zone change was approved on June 23 (download link to the meeting packet here). It was a removal of the holding symbol to confirm that the infrastructure capacity was sufficient. The proposal is a "12 storey mixed use building containing 66 units (95 beds) and approximately 100 square metres of commercial space on the ground floor".
Spokes Wrote:Found this interesting. One drawing from the design firm shows two commercial units facing Lester with an art gallery facing university. A new gallery would be interesting here for sure.Most of the time, the labels for the commercial units in renderings have nothing to do with reality.