12-22-2018, 11:02 PM
(12-03-2018, 09:09 AM)mastermind Wrote:(12-01-2018, 11:17 AM)Spokes Wrote: Wow very cool. I'm surprised they're installing those so early
It's part of the building structure, this is a full precast concrete building similar to the two at Barrel Yards or the three at Trio on Belmont.
Arrow 2 will also be precast concrete.