08-07-2018, 05:34 PM
As of last week, the excavation along the King Street side was at depth and they have (seemingly non-structural) concrete about half-way back towards Caroline. Still some excavation going on towards Caroline.
The concrete is strange. No sign of a prepared base for drainage or any reinforcing steel. I have to assume it is just to make the site easier to work and the real floor will come later
The concrete is strange. No sign of a prepared base for drainage or any reinforcing steel. I have to assume it is just to make the site easier to work and the real floor will come later