Two constructions on this site.
222 Albert (the foreground building) and 228 Albert (the background building). Lego's are in the ground for 228. Just a cement slab right now for 222.
Both are being constructed simultaneously, but 222 is expected to be finished first (it's a precast design construction, vs. ICF construction on 228).
222 Albert (the foreground building) and 228 Albert (the background building). Lego's are in the ground for 228. Just a cement slab right now for 222.
Both are being constructed simultaneously, but 222 is expected to be finished first (it's a precast design construction, vs. ICF construction on 228).