11-11-2017, 07:39 PM
At one point I believe that the Mayfair portion of the project was going to be developed separate from the residential towers by a different team. It could be been sold at that point.
Wasn't their pretty specific time lines layed out by the city as to when building permits and construction had to start by as a condition of the sale? I am surprised that the project as lingered on for such a long period.
Wasn't their pretty specific time lines layed out by the city as to when building permits and construction had to start by as a condition of the sale? I am surprised that the project as lingered on for such a long period.