11-19-2014, 11:18 PM
(11-19-2014, 11:29 AM)panamaniac Wrote: The Record is reporting that the total cost of the water feature will be $1.1 million. Construction in 2017, if approved. I believe the City's cost reflects the cost of Evian.
http://www.therecord.com/news-story/5145...-fountain/
I like the concept which will add much to make the area less concrete wall and flat surfaces.
This project would be a much better concept for all the community if they built a wide ramp where the tiered staircase is going. Why plan for accessibility if you aren't forced to?
Even for public projects (outside Toronto and Ottawa) accessibility is really never considered. Cheaper to build a wide, sweeping ramp than sets of landings and stairs.