05-05-2025, 03:08 PM
Currently working on floor 23 in the second tower. They might need an HVAC structure on top of that but they should be topped out within a month or so.
|
Vertikal (471-481 King St E) | 23 & 19 fl | U/C
|
|
« Next Oldest | Next Newest »
|