03-25-2025, 04:36 AM
(03-24-2025, 01:01 AM)Square Wrote: Starting on the 2nd above ground floor. Also the concrete pumper is installed. Guessing this building will not be precast.
It's also possible to do precast only on the floors above the podium. The podium layout is usually more variable and less well suited to precast.

