09-07-2024, 03:06 PM
The OLT has set out the hearing timetable for this project. Looks like it'll be late 2025 before we hear anything and in that time the housing crisis will have only become worse and lots more suffering incurred along the way.
https://www.canlii.org/en/on/onlt/doc/20...83204.html
https://www.canlii.org/en/on/onlt/doc/20...83204.html
local cambridge weirdo