(07-21-2024, 09:50 PM)Square Wrote:(07-19-2024, 11:24 AM)CuilTard Wrote: July 19 (Putting the lid on 20th floor)
Checked today, they are starting the wall forms for the 20th floor.
Oops, did I mis-count? I thought the walls were done on 20 and the slip forms there ready to pour the 20th lid/21st slab? Was counting like this. Does the entrance to the underground count as a floor?