02-05-2024, 04:14 PM
Things have started to happen on the site. There is a construction trailer parked next to the office building. They are excavating trenches along Courtland and Palmer and dumping the dirt at the back of the site. There is an excavator, two dump trucks and a bulldozer working. There is some other equipment near the Borden St. entrance.