(08-02-2023, 12:32 AM)CP42 Wrote:(08-01-2023, 08:42 PM)Lebronj23 Wrote: Moving along nicely!
Curious if it’s just this pit being dug or also tower 4?
I always wondered how they would construct 1 tower at a time if they plan to be connected by the podium and podium top amenity space
My understanding is this is just tower 3 - although the parking garage footprint is much larger, given the whole site will eventually be one connected garage underneath.
I’m also curious as to how they plan to build them in two phases with a shared podium… I guess we will find out soon!
I just revisited the site plans that I have (although from 2020, so things may have changed - the tower designs of 3 and 4 did so it wouldn’t be a surprise), and noticed that they are excavating both the phase 2a and phase 2b areas:
(Note the excavation directly in front of the shared podium of towers 1 and 2 here)
Also if the towers are being built in the same locations as the plan above, doesn’t it seem like the crane base being installed is too far from the tower?