(05-15-2023, 07:49 AM)Bjays93 Wrote:(05-12-2023, 04:25 PM)taylortbb Wrote: I can't figure out who wants 75,000 sq ft of institutional space, I can't imagine they're building it on spec.Gotta agree with the elevator concerns here. Bring on the height but 3 per building is not enough. You need a minimum of 5 if not 6 per building at this height.
Also, looking through the OPA/ZBA packages I'm really wondering about the number of elevators. It shows 3 per tower, which means about 200 units per elevator. 100 units per elevator seems like the standard for other buildings, so I'm wondering if they're fast elevators or if everyone is going to be waiting a long time.
Really makes it stink of "lets rezone this to a super high density and then flip the land". Institutional demand could be made up to help with the rezoning. This groups done this on another project recently