07-30-2022, 09:06 PM
Two more floors added in July, so this should top out in August, with occupancy early next year. The commercial building still only has the frame, but I expect it will be built much faster (pour concrete floors, add steel roof and exterior glass/cladding) so it, too, should be ready for occupancy sometime in 2023.
Interestingly, only the first two floors are cast concrete, the upper floors are being built using concrete blocks.
Interestingly, only the first two floors are cast concrete, the upper floors are being built using concrete blocks.