Waterloo Region Connected
The Metalworks (Guelph) | 8-10 Floors | Proposed - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Connected Café (https://www.waterlooregionconnected.com/forumdisplay.php?fid=15)
+--- Forum: Outside Waterloo Region (https://www.waterlooregionconnected.com/forumdisplay.php?fid=33)
+--- Thread: The Metalworks (Guelph) | 8-10 Floors | Proposed (/showthread.php?tid=374)



The Metalworks (Guelph) | 8-10 Floors | Proposed - The85 - 03-03-2015

The Metalworks - Guelph
[Image: UVitWIrf.jpg]
5 Arthur Street South, Guelph
Developer: Fusion Homes
8 and 10 floor mixed use development





[Image: ym3YntMX.jpg]


[Image: cSBRB74f.jpg]



RE: The Metalworks (Guelph) | 8-10 Floors | Proposed - panamaniac - 03-03-2015

I assume that will be built in phases?


RE: The Metalworks (Guelph) | 8-10 Floors | Proposed - Spokes - 03-04-2015

One would have to assume.

That being said, I love the massing of that building in the last render.