![]() |
The Metalworks (Guelph) | 8-10 Floors | Proposed - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Connected Café (https://www.waterlooregionconnected.com/forumdisplay.php?fid=15) +--- Forum: Outside Waterloo Region (https://www.waterlooregionconnected.com/forumdisplay.php?fid=33) +--- Thread: The Metalworks (Guelph) | 8-10 Floors | Proposed (/showthread.php?tid=374) |
The Metalworks (Guelph) | 8-10 Floors | Proposed - The85 - 03-03-2015 The Metalworks - Guelph
![]() 5 Arthur Street South, Guelph
Developer: Fusion Homes
8 and 10 floor mixed use development
![]() ![]() RE: The Metalworks (Guelph) | 8-10 Floors | Proposed - panamaniac - 03-03-2015 I assume that will be built in phases? RE: The Metalworks (Guelph) | 8-10 Floors | Proposed - Spokes - 03-04-2015 One would have to assume. That being said, I love the massing of that building in the last render. |