Waterloo Region Connected
Vertikal (471-481 King St E) | 23 & 19 fl | U/C - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5)
+--- Thread: Vertikal (471-481 King St E) | 23 & 19 fl | U/C (/showthread.php?tid=131)



RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - Ellensparky - 01-04-2024

Any updates, pics?


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - Rainrider22 - 01-05-2024

This one usually only gets updated about every 6 months, otherwise the difference is discernable


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - ac3r - 01-05-2024

It is like watching hair grow. You don't really notice the changes day to day...or in this case, month to month.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - Acitta - 01-06-2024

           


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - Acitta - 01-06-2024

Comparing Street View from Oct '23 to my pictures from today, you see that tower 2 has only added 3 floors.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - tomh009 - 01-06-2024

(01-06-2024, 03:00 PM)Acitta Wrote: Comparing Street View from Oct '23 to my pictures from today, you see that tower 2 has only added 3 floors.

One floor per month, that's the same pace as they has for Tower 1.

The podium looks quite decent, certainly better than DTK.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - ac3r - 01-06-2024

That's only because it isn't finished yet.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - mastermind - 01-08-2024

Are all those large grey bricks that looks like cinder blocks going to be covered with something? Or is that the look.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - ac3r - 01-08-2024

I think they'll be covered. The podium is typical Waterloo Region architecture: a grab bag of assorted materials resulting in a bizarre aesthetic. This one will be colorful.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - tomh009 - 01-08-2024

(01-08-2024, 09:42 AM)mastermind Wrote: Are all those large grey bricks that looks like cinder blocks going to be covered with something?  Or is that the look.

I expect they will be. It was the same look for the neighbouring buildings (B&T and midrise apartment building) and those are being cladded.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - K.P. - 01-08-2024

I think they are the finished product. 90x190x290 Arriscraft Stone likely. Smoother finish, similar size as CMU.
-flush w/ brick
-electrical boxes in
-overhangs foundation 1"
-Wall type likely concrete substrate, 50mm rigid insulation, 25mm air space, 90mm stone/brick veneer


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - tomh009 - 02-11-2024

From the Charles St side, the first tower and podium are starting to look fairly complete. And with the red being not very visible, it looks OK to me, the tower similar to DTK but with a better podium, maybe forced to be so because of the residential podium rather than a parking one.

   


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - ac3r - 02-12-2024

Wait when the heck did that tower top out? I stopped looking up because nothing ever seemed to be happening so I somehow missed this lol.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - DK519 - 02-12-2024

(02-12-2024, 05:12 PM)ac3r Wrote: Wait when the heck did that tower top out? I stopped looking up because nothing ever seemed to be happening so I somehow missed this lol.

It's been a little bit.

Maybe a couple months? Maybe more.


RE: Vertikal (471-481 King St E) | 23 & 19 fl | U/C - ZEBuilder - 02-12-2024

(02-12-2024, 06:46 PM)DK519 Wrote:
(02-12-2024, 05:12 PM)ac3r Wrote: Wait when the heck did that tower top out? I stopped looking up because nothing ever seemed to be happening so I somehow missed this lol.

It's been a little bit.

Maybe a couple months? Maybe more.

The tower itself topped out in early June, the mechanical penthouse then took until early July to be completed with the crane coming down in early August. Since then the Cameron Tower has been the focus as well as the King St podium, which is now onto the third floor for the entire block.