RE: Duke Tower Kitchener | 39 fl | U/C - Square - 10-01-2019

This development doesn't look like it's going to have any underground parking. Do not see any incline concrete.


RE: Duke Tower Kitchener | 39 fl | U/C - jgsz - 10-03-2019

2019-10-03

I'm baffled why all that spaghetti like wire (or tubing) has concrete poured over it.  Does anyone have any idea what's happening?

   


RE: Duke Tower Kitchener | 39 fl | U/C - EdM - 10-03-2019

(10-03-2019, 10:23 AM)jgsz Wrote: 2019-10-03

I'm baffled why all that spaghetti like wire (or tubing) has concrete poured over it.  Does anyone have any idea what's happening?

It's flexible conduit. Wire will be pulled in later for lights and receptacles and all of the other electrical things. It's a lot easier and cheaper to run this in the slab than to attach conduits to the bottom later on.


RE: Duke Tower Kitchener | 39 fl | U/C - Spokes - 10-03-2019

I'm surprised it's put down in such a haphazard way, seems sloppy

EDIT: If it's getting pulled later, I guess that makes more sense.


RE: Duke Tower Kitchener | 39 fl | U/C - tomh009 - 10-03-2019

(10-01-2019, 05:03 PM)Square Wrote: This development doesn't look like it's going to have any underground parking.  Do not see any incline concrete.

You are correct, it will not.


RE: Duke Tower Kitchener | 39 fl | U/C - ijmorlan - 10-03-2019

(10-03-2019, 10:36 AM)Spokes Wrote: I'm surprised it's put down in such a haphazard way, seems sloppy

EDIT:  If it's getting pulled later, I guess that makes more sense.

Remember the part you can see is the part that isn’t ready for concrete yet. Note that some segments are coiled up. While I doubt they go to great pains to ensure the conduit is absolutely straight before pouring the concrete, they will make sure the conduits go the right place, probably fairly directly, rather than winding all over the place.

I do not envy the guy who has to make sure they all go to the right place. Any errors are literally cast in concrete.


RE: Duke Tower Kitchener | 39 fl | U/C - Square - 10-03-2019

(10-03-2019, 12:42 PM)tomh009 Wrote:
(10-01-2019, 05:03 PM)Square Wrote: This development doesn't look like it's going to have any underground parking.  Do not see any incline concrete.

You are correct, it will not.

Thank you Tom.

I'm very curious how those tiles are used.  Any links or info?

Thank you.


RE: Duke Tower Kitchener | 39 fl | U/C - megabytephreak - 10-03-2019

(10-03-2019, 06:47 PM)Square Wrote: I'm very curious how those tiles are used.  Any links or info?

Thank you.

It looks like this system: https://www.peri-usa.com/products/applications/formwork/slab-formwork/skydeck-slab-formwork.html
And the wall form are from the same company, probably this: https://www.peri-usa.com/products/applications/formwork/trio-panel-formwork.html , but they have three or four similar looking ones.


RE: Duke Tower Kitchener | 39 fl | U/C - Square - 10-04-2019

Thank you Megabytephreak!, those are great links.


RE: Duke Tower Kitchener | 39 fl | U/C - jgsz - 10-04-2019

(10-03-2019, 10:07 PM)megabytephreak Wrote:
(10-03-2019, 06:47 PM)Square Wrote: I'm very curious how those tiles are used.  Any links or info?

Thank you.

It looks like this system: https://www.peri-usa.com/products/applications/formwork/slab-formwork/skydeck-slab-formwork.html
And the wall form are from the same company, probably this: https://www.peri-usa.com/products/applications/formwork/trio-panel-formwork.html , but they have three or four similar looking ones.

That's exactly what they're using on this site.  Thanks for the links!


RE: Duke Tower Kitchener | 39 fl | U/C - tomh009 - 10-07-2019

I think they are using the same system at Arrow 2.


RE: Duke Tower Kitchener | 39 fl | U/C - dirk967 - 10-09-2019

(10-03-2019, 12:42 PM)tomh009 Wrote:
(10-01-2019, 05:03 PM)Square Wrote: This development doesn't look like it's going to have any underground parking.  Do not see any incline concrete.

You are correct, it will not.

There is 1 level of underground parking.


RE: Duke Tower Kitchener | 39 fl | U/C - jgsz - 10-12-2019

2019-10-11

They were working late yesterday pouring and leveling cement.

   


RE: Duke Tower Kitchener | 39 fl | U/C - white_brian - 10-12-2019

Wow on Sept 23 the left side was still dirt


RE: Duke Tower Kitchener | 39 fl | U/C - jgsz - 10-18-2019

2019-10-18

All of the basement is covered.  For some reason they took away part of the covered sidewalk on the Frederick Street side.