TEK Tower (30 Francis) | 45 fl | U/C - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4) +--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5) +--- Thread: TEK Tower (30 Francis) | 45 fl | U/C (/showthread.php?tid=1537) |
RE: TEK Tower (30 Francis) | 45 fl | U/C - CP42 - 06-13-2024 Construction elevator has gone up and the final pieces of the pre-cast cladding on the podium are going up. They look to be on floor 16/17: ![]() ![]() RE: TEK Tower (30 Francis) | 45 fl | U/C - CuilTard - 06-14-2024 My regular update wasn't until next week, but in case U-Haul moves back in the way, here's one from today. Crane got taller, right? ![]() RE: TEK Tower (30 Francis) | 45 fl | U/C - Rainrider22 - 06-14-2024 Definitely taller now. For the engineers or builders on this forum, can you please explain to me why some buildings have the crane on the outside and other buildings have it on the inside ? It is my understanding that when the crane is setup inside, the crane crawls up the building so you don't need as many tower sections. RE: TEK Tower (30 Francis) | 45 fl | U/C - ac3r - 06-15-2024 My first guess would be for the boom reach to compensate for the fact that podium is so large and they're also pulling up supplies from all sides of the project due to the limited amount of space they are needing to work with. It's probably just easier. RE: TEK Tower (30 Francis) | 45 fl | U/C - Rainrider22 - 06-15-2024 That makes sense. Thanks RE: TEK Tower (30 Francis) | 45 fl | U/C - Lebronj23 - 06-15-2024 We could start seeing window wall/glazing any day now RE: TEK Tower (30 Francis) | 45 fl | U/C - ac3r - 06-15-2024 (06-15-2024, 07:59 AM)Rainrider22 Wrote: That makes sense. Thanks Don't quote me, though! I know nothing about cranes, that was just my first guess haha. RE: TEK Tower (30 Francis) | 45 fl | U/C - Rainrider22 - 06-15-2024 Lol well, seems reasonable RE: TEK Tower (30 Francis) | 45 fl | U/C - mastermind - 06-16-2024 If you have the tower crane inside the building then there's a hole for it in every floor that needs to be filled in later. Maybe that's worth it to avoid by putting it outside. RE: TEK Tower (30 Francis) | 45 fl | U/C - westwardloo - 06-17-2024 (06-16-2024, 08:28 PM)mastermind Wrote: If you have the tower crane inside the building then there's a hole for it in every floor that needs to be filled in later. Maybe that's worth it to avoid by putting it outside. When it is installed inside they typically install the crane in the elevator core. So they don't need to fill anything in. RE: TEK Tower (30 Francis) | 45 fl | U/C - CuilTard - 06-28-2024 June 28th. Almost finished the podium wrap on all sides. ![]() RE: TEK Tower (30 Francis) | 45 fl | U/C - tomh009 - 06-28-2024 From this angle it looks pretty good ... how it will look from the street (when completed) is still TBD. RE: TEK Tower (30 Francis) | 45 fl | U/C - CP42 - 06-28-2024 (06-28-2024, 03:41 PM)tomh009 Wrote: From this angle it looks pretty good ... how it will look from the street (when completed) is still TBD. I’m interested to see how it looks once windows and other exterior cladding starts going up RE: TEK Tower (30 Francis) | 45 fl | U/C - ac3r - 06-28-2024 IN8 isn't gr8, but they sure work efficiently. They'll have built a whole skyscraper in the time it took Drewlo to dig a hole. RE: TEK Tower (30 Francis) | 45 fl | U/C - Lebronj23 - 07-04-2024 Glass installation has started on the King and a Francis Green side of the building. Couldn’t snap a pic of it however |