RE: Drewlo Downtown project | 23 & 19 fl | U/C - Rainrider22 - 02-01-2022

Slow and Steady wins the race.... I hear they take all the left overs from the trucks at the rest of the downtown construction sites. This saves the truckers from having to find a spot on the construction site to dispose of the remaining load.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Camper - 02-03-2022

(02-01-2022, 10:39 AM)Rainrider22 Wrote: Slow and Steady wins the race.... I hear they take all the left overs from the trucks at the rest of the downtown construction sites. This saves the truckers from having to find a spot on the construction site to dispose of the remaining load.

Sure looks like it. There's always ripped tarps flapping around whenever I drive by. I don't think site cleanup is a high priority.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - jeffster - 02-03-2022

Guys, stop getting your panties tied in a knot over this build. It WILL be completed by the time you retire, so you're retirement plans are not ruined.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Rainrider22 - 02-03-2022

I dunno, I can retire in 4 years !!


RE: Drewlo Downtown project | 23 & 19 fl | U/C - jeffster - 02-03-2022

(02-03-2022, 09:04 PM)Rainrider22 Wrote: I dunno, I can retire in 4 years !!

Well...OK...you'll be able to see the 12th floor rough-in for tower 1. Wish I had better news.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - mastermind - 02-06-2022

Now that the tower is showing up out of the podium I do think the shape of it is turning out ok.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - tomh009 - 03-11-2022

Have been checking this at least once a week to gauge the progress. It took them a little over one month to put up the latest floor on the Madison/King tower. That's substantially slower than, say, Auburn, who was taking 2-3 weeks per floor on the Bow (aka Arrow 2).

Now, Auburn used precast on the above-ground portions, Drewlo does not, so I do expect that will result in slower construction here.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Ellensparky - 03-13-2022

Projected Occupancy is Summer 2023


RE: Drewlo Downtown project | 23 & 19 fl | U/C - tomh009 - 03-14-2022

(03-13-2022, 03:49 PM)Ellensparky Wrote: Projected Occupancy is Summer 2023

They'll need to speed up a bit, because I think this would require topping the first tower (23 floors?) by the end of 2022 and they are at only eight at the moment.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Lens - 03-15-2022

They're on the 10th floor of the north tower. Still a ways to go but I believe that's the shorter one so it could theoretically top out in 3-4 months.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - tomh009 - 03-15-2022

(03-15-2022, 05:09 PM)Lens Wrote: They're on the 10th floor of the north tower. Still a ways to go but I believe that's the shorter one so it could theoretically top out in 3-4 months.

It took them a month to put up the latest floor so I do thing 3-4 months is a bit optimistic. If it's the shorter tower, then they might indeed be able to top it out by the end of the year.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Lebronj23 - 03-15-2022

The site is super dusty, messy and cluttered. I also never see the crane moving or any workers there. Could be a while lol


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Ellensparky - 04-17-2022

Any updates for this?


RE: Drewlo Downtown project | 23 & 19 fl | U/C - Acitta - 04-17-2022

(04-17-2022, 04:22 PM)Ellensparky Wrote: Any updates for this?

It is progressing, but seems to be the slowest building project in the Region.


RE: Drewlo Downtown project | 23 & 19 fl | U/C - tomh009 - 04-17-2022

(04-17-2022, 05:17 PM)Acitta Wrote:
(04-17-2022, 04:22 PM)Ellensparky Wrote: Any updates for this?

It is progressing, but seems to be the slowest building project in the Region.