RE: K2 Condos - BuildingScout - 11-26-2014

Article on St Sophia-developer negotiations (or lack thereof):

http://www.therecord.com/news-story/5158166-st-sophia-church-developer-continue-to-clash-in-waterloo/Article


RE: K2 Condos - taylortbb - 03-28-2015

Looks like they've started construction. Huge line of cement trucks along King St today, all for this site.


RE: K2 Condos - Drake - 03-28-2015

I was past there yesterday and noted the hole to be completely excavated and the wooden barracades/foundation/shoring to all be in place. It is quite a large hole.


RE: K2 Condos - Spokes - 03-28-2015

Are both phases being done at once?


RE: K2 Condos - Viewfromthe42 - 03-30-2015

I was on the 7am bus at Conestoga to the Maple Syrup Festival, and my 7C took me by the start of their pour, before 6:30am. Around 5 or 6, they were still pouring, had three vehicles with conveyors to deposit cement in the hole, being filled by four cement trucks, with a peak line going back to Ethel's and at least 17 more cement trucks in the line, so 21 trucks at one time at least.


RE: K2 Condos - Markster - 03-30-2015

(03-28-2015, 11:41 PM)Spokes Wrote: Are both phases being done at once?

I wasn't aware of any phasing being proposed for K2, so I assume it's being built in one shot.


RE: K2 Condos - BuildingScout - 03-30-2015

   
This was a massive concrete pour, and all there is to show for it is a relatively small area which looks like a house foundation slab. I'm guessing that in this case appearances are misguiding and that the "slab" is actually a deep foundation several feet deep, but I'm no engineer so perhaps someone who knows more about these things can comment.


RE: K2 Condos - Spokes - 03-31-2015

The underground levels always take so much longer to complete. And subsequently, always toy with us a little while longer haha.


RE: K2 Condos - nms - 03-31-2015

Often, the foundations slabs are quite thick for tall buildings. I recall hearing that the slab for some of the buildings on Lester Street could be in the 10' to 20'+ thick range.


RE: K2 Condos - Pheidippides - 04-17-2015

Tower crane is up.


RE: K2 Condos - rangersfan - 05-20-2015

May 15, 2015

[Image: Ipx8N3w.png]

[Image: P4kN4rm.png]


RE: K2 Condos - Markster - 06-30-2015

This one is up at grade now! One bit of a concrete stairwell has been built for the ground floor


RE: K2 Condos - Pheidippides - 10-16-2015

October 15, 2015
[Image: 1tv98j.jpg]


RE: K2 Condos | 21 fl | U/C - Pheidippides - 04-18-2016

Windows starting to go in:
   


RE: K2 Condos | 21 fl | U/C - Pheidippides - 06-01-2016