Grand River Transit - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: Grand River Transit (/showthread.php?tid=13) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
|
RE: Grand River Transit - urbd - 01-08-2018 I heard that the decision might be that the 7 northbound will simply not stop at King/William at all. No turning right on William towards Regina. Simply skipping that intersection. Terrible decision, imo. And re: the stop close to King/Erb for the 7/200/5. Currently a huge mess... cars parked on the bus bay are a daily occurrence. But this could be fixed with better, bigger signs and also when the bus shelter is installed in the spring and the streetscape is completed. RE: Grand River Transit - urbd - 01-08-2018 And re: Victoria/King northbound, I heard that Grandlinq still has work to do there so that's why it's not in service. Ugh. RE: Grand River Transit - Pheidippides - 01-08-2018 GRT piloting buses with driver shields Posted on Monday January 08, 2018 Starting this week, customers may see buses equipped with driver shields on different routes in Kitchener, Waterloo and Cambridge. GRT is pilot testing three different styles of driver barrier on eight different buses: Three buses will be equipped with a sliding glass barrier. Three buses will be equipped with a sliding glass barrier with an extending slider. Two buses will be equipped with a fixed system barrier. The pilot testing period will be approximately three months. After the pilot period ends, GRT will evaluate the different shield types. The shields are the latest in a series of tools ensuring the safety of drivers, customers and the community. RE: Grand River Transit - Pheidippides - 01-09-2018 Did GRT get a new contractor to remove the snow this year? I have found that snow removal has been worse than usual this year. RE: Grand River Transit - danbrotherston - 01-09-2018 (01-09-2018, 10:34 PM)Pheidippides Wrote: Did GRT get a new contractor to remove the snow this year? I believe so. Definitely worth calling them about it. RE: Grand River Transit - KevinL - 01-09-2018 A terrible side effect just now is many stops have inches of snow on them still, and we're due for a good amount of rain in the coming days. Slush city, everyone. :/ RE: Grand River Transit - goggolor - 01-10-2018 Snow clearing at bus stops has been really bad this year... lots of people complaining to GRT on Twitter and they're responding that it may take their contractors "a day or two" after a heavy snowfall to clear the stops. But even this morning, a full 48 hours after our major snowfall ended, most of the stops I use on King St or the 200 iXpress line are still several inches of snow and ice, and drivers are asking riders to use the front doors as it's dangerous to exit out the back. RE: Grand River Transit - goggolor - 01-10-2018 The saddest of many, many complaints to the GRT today about all the uncleared bus stops:
RE: Grand River Transit - danbrotherston - 01-10-2018 (01-10-2018, 07:23 PM)goggolor Wrote: The saddest of many, many complaints to the GRT today about all the uncleared bus stops: I just got off the phone with the CSR. They've told me in no uncertain terms that three days after the storm, we can keep waiting. Not till 72 hours has passed can we expect bus stops to be cleared. Nearly 100% of the 7 bus stops on King between Columbia and Downtown are blocked. I'm pretty jaded, and I'm still shocked by how bad this is. RE: Grand River Transit - KevinL - 01-10-2018 In fairness, several stops in my neighbourhood were cleared by this morning. But not all of them. And they probably should have been done by last night. We need a better standard. RE: Grand River Transit - goggolor - 01-10-2018 In this article from when GRT changed snow clearing contractors a couple years ago (https://www.therecord.com/news-story/6084199-no-more-snowed-in-bus-stops-new-grt-contractor-hired-to-shovel-in-kitchener-cambridge-and-waterloo/) it says: "About 100 bus stops have been identified as priorities with help from the Grand River Accessibility Advisory Committee. Those stops need to be cleared immediately and monitored for 72 hours. They might be near seniors' residences or community centres that offer day programs." One of the stops I reported to GRT yesterday was right in front of the senior's center at King & Allen, and it still wasn't clear today. I wonder if that accessibility program is still in place? RE: Grand River Transit - danbrotherston - 01-10-2018 The CSR said it was. RE: Grand River Transit - Pheidippides - 01-10-2018 Part of the problem is the definition of “cleared”. All the #8 stops along Belmont between Highland and Union did have snow removed but it was not even remotely down to the pavement and nothing around the shelters themselves had been cleared. Basically, wherever the small bobcat the contractor is using could fit, which is not many places when you factor in the geometry of the bus stop pole, shelter, hydro poles etc., some snow had been pushed aside usually blocking the shelter access or access to the bus itself worse than before. Then there are other stops like Patricia and Highland and Highland at Ruby that have had nothing done. RE: Grand River Transit - danbrotherston - 01-11-2018 Talked to GRT this morning, I am now read the policy by the CSR, 72 hours to start, 48 hours to clear...5 days clear bus stops, next storm is forecast by then, 0 days with cleared bus stops. We're spending half a million dollars to pretend that bus stops will be clear. RE: Grand River Transit - chutten - 01-11-2018 Was there a rider in the policy for what happens if the snow starts again before they're finished? Do they just get a pass for another 72 hours, or do they have to show they've cleared all stops of the previous storm's snow within the original 72+48 period? |