Waterloo Region Connected
Garment Street Condos | 25 & 6 fl | U/C - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5)
+--- Thread: Garment Street Condos | 25 & 6 fl | U/C (/showthread.php?tid=1072)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34


RE: Garment Street Condos | 25 & 6 fl | Proposed - jamincan - 06-21-2019

Tower ♆.


RE: Garment Street Condos | 25 & 6 fl | Proposed - Rainrider22 - 06-21-2019

(06-21-2019, 10:00 AM)jamincan Wrote: Tower ♆.
HAHA  thanks...


RE: Garment Street Condos | 25 & 6 fl | Proposed - JK2021 - 07-13-2019

Hey, how is the excavation going? Does anyone have any recent photos?


RE: Garment Street Condos | 25 & 6 fl | Proposed - white_brian - 07-14-2019

It looks like they are doing a staggered excavation. Hard to get a photo cause of the distance of the site and the barrier. Pilings are going in behind Huck glove


RE: Garment Street Condos | 25 & 6 fl | Proposed - Momo26 - 07-15-2019

A person living in the One Hundred condo already built - and with a vantage point on the one the sides that would provide a view, would probably be best positioned to snap photos!


RE: Garment Street Condos | 25 & 6 fl | Proposed - artembunglito - 07-15-2019

(07-13-2019, 11:36 AM)JK2021 Wrote: Hey, how is the excavation going? Does anyone have any recent photos?

Excavation is mainly on the other 100 vic tower right now, not much for the garment street project yet.


RE: Garment Street Condos | 25 & 6 fl | Proposed - foozlewoozle - 07-15-2019

I was originally told November 2020 would be earliest move-in date for Garment. At this rate, probably not even close.


RE: Garment Street Condos | 25 & 6 fl | Proposed - taylortbb - 07-16-2019

(07-15-2019, 09:19 PM)foozlewoozle Wrote: I was originally told November 2020 would be earliest move-in date for Garment. At this rate, probably not even close.

Yeah, Charlie West is supposed to be October 2020 and it's a full year ahead of Garment at this point (and they haven't taken it slow).


RE: Garment Street Condos | 25 & 6 fl | Proposed - artembunglito - 07-16-2019

(07-15-2019, 09:19 PM)foozlewoozle Wrote: I was originally told November 2020 would be earliest move-in date for Garment. At this rate, probably not even close.

My move in date was ~8 months after they originally told me. I have doubts yours will be 2020. A silver lining was I had very few minor issues to correct with my unit.


RE: Garment Street Condos | 25 & 6 fl | Proposed - artembunglito - 07-18-2019

(07-13-2019, 11:36 AM)JK2021 Wrote: Hey, how is the excavation going? Does anyone have any recent photos?

As I previously said, not much being done garment side:

[Image: J8uW7wY.jpg]


RE: Garment Street Condos | 25 & 6 fl | Proposed - white_brian - 07-19-2019

Today the large pile of dirt beside Huck glove was being removed and the pile driver was putting the last piles in along the lane


RE: Garment Street Condos | 25 & 6 fl | Proposed - Spokes - 07-19-2019

Great view from up there


RE: Garment Street Condos | 25 & 6 fl | Proposed - white_brian - 07-26-2019

Excavation on the rear of the property is now across the Bramm St (at least one level down, probably for shoring purposes). The pile driver is no longer on site


RE: Garment Street Condos | 25 & 6 fl | Proposed - white_brian - 07-27-2019

Line of dump trucks doing a Saturday excavation on site


RE: Garment Street Condos | 25 & 6 fl | Proposed - JK2021 - 08-03-2019

Hey does anyone have a photo of it? Thanks