![]() |
|
ION - Waterloo Region's Light Rail Transit - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
|
RE: ION - Waterloo Region's Light Rail Transit - cherrypark - 09-11-2025 (09-07-2025, 12:59 PM)bravado Wrote:(09-05-2025, 02:20 PM)cherrypark Wrote: At this point just do the BRT for less, hope that GO to Cambridge gets approved, and live to fight for whatever Phase 3 would have been within KW. To be clear - I would absolutely rather and advocate for getting a Phase 2 built and don't think Cambridge isn't deserving. I just don't see what the political path is when Cambridge council seems disinterested or even opposed and whatever costing is being used is making it seem like constructing a modern wonder. The skip this to get KW service later is more a worry that Phase 2 is becoming/will be such an albatross that the political will to do more beyond that will be toast for good. Would much prefer to be wrong. RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-12-2025 A big part of the reason for the high phase 2 costs stems from having to cross the river and the 401. That would have been expensive even if built at the same time as phase 2. That makes me think that "proper" BRT (with protected lanes) would be far less expensive, as it could potentially leverage existing bridges or underpasses. It's still much faster than buses in transit, and semi-permanent (routes not easily changed). Not as "nice" as LRT, but would that make sense as a compromise? Maybe a better routing could even be achieved? RE: ION - Waterloo Region's Light Rail Transit - bravado - 09-12-2025 (09-12-2025, 03:47 PM)tomh009 Wrote: A big part of the reason for the high phase 2 costs stems from having to cross the river and the 401. That would have been expensive even if built at the same time as phase 2. But even that statement is accepting that the cost estimates are normal. We're getting fullytunneled underground metro costs per km for an above-ground, normal concrete light rail system. The Speed River isn't the grand canyon, but the price seems to imply that it is. $210M per km is a wild cost estimate for completely above-ground light rail on flat land and I don't want anyone to treat it like that's "just the cost of doing business". RE: ION - Waterloo Region's Light Rail Transit - Kodra24 - 09-12-2025 (09-12-2025, 04:20 PM)bravado Wrote:(09-12-2025, 03:47 PM)tomh009 Wrote: A big part of the reason for the high phase 2 costs stems from having to cross the river and the 401. That would have been expensive even if built at the same time as phase 2. It's the cost of doing business "in Canada" RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-12-2025 (09-12-2025, 04:20 PM)bravado Wrote:(09-12-2025, 03:47 PM)tomh009 Wrote: That makes me think that "proper" BRT (with protected lanes) would be far less expensive, as it could potentially leverage existing bridges or underpasses. It's still much faster than buses in transit, and semi-permanent (routes not easily changed). Not as "nice" as LRT, but would that make sense as a compromise? Maybe a better routing could even be achieved? There is Speed River and Grand River. Also elevated across the Fairview Mall parking lot, Fairway Road and the CP Rail line. Elevated crossing over the Hwy 8 exit ramp. Elevated on Shantz Hill Road. Elevated again over the CP Rail crossing first and then CN Rail. So, while not tunnelled, the amount of bridges and elevated sections is quite significant, compared to essentially zero in phase 1. I'm not qualified to assess how much of the cost impact is due to these bridges and elevated segments, though, how much to construction cost inflation, and how much to something else. RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-12-2025 (09-12-2025, 04:27 PM)Kodra24 Wrote:(09-12-2025, 04:20 PM)bravado Wrote: $210M per km is a wild cost estimate for completely above-ground light rail on flat land and I don't want anyone to treat it like that's "just the cost of doing business". Phase 1 was built "in Canada", too, at a very comparable cost to a similar European project. RE: ION - Waterloo Region's Light Rail Transit - KevinL - 09-12-2025 (09-12-2025, 05:37 PM)tomh009 Wrote: compared to essentially zero in phase 1. Phase 1 had a major component - the King Street underpass of the rail line. But very little otherwise, certainly. RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 09-12-2025 (09-12-2025, 06:12 PM)KevinL Wrote:(09-12-2025, 05:37 PM)tomh009 Wrote: compared to essentially zero in phase 1. And even that is properly charged mostly to the road network. The LRT tracks only add a couple of lanes to the length of the bridge / width of the underpass. RE: ION - Waterloo Region's Light Rail Transit - ZEBuilder - 09-13-2025 (09-12-2025, 04:20 PM)bravado Wrote:(09-12-2025, 03:47 PM)tomh009 Wrote: A big part of the reason for the high phase 2 costs stems from having to cross the river and the 401. That would have been expensive even if built at the same time as phase 2. Go look at the post I made last week but the cost we have per km is one of the more sane cost estimates of LRTs in Ontario, at least for ones that are comparable. Phase 2 is arguably even more complicated then some of those and still comes in cheaper so it is arguably the cost of doing business. 210M is no where near fully tunneled metro fyi. The line 2 extension is about 1 billion dollars per km. Line 1 extension to Vaughan was roughly half a billion per km so by no means are we getting fully tunneled metro costs. RE: ION - Waterloo Region's Light Rail Transit - ZEBuilder - 09-13-2025 (09-12-2025, 05:37 PM)tomh009 Wrote: There is Speed River and Grand River. Also elevated across the Fairview Mall parking lot, Fairway Road and the CP Rail line. Elevated crossing over the Hwy 8 exit ramp. Elevated on Shantz Hill Road. Elevated again over the CP Rail crossing first and then CN Rail. The bridges and elevated sections add significant cost compared to road running the LRT but that is to be expected. The bridges themselves aren't inherently difficult to construct or design, but the type of bridge and then the soil conditions will both change how difficult it is to construct and thus impact the cost. Most of the time on short to medium span bridges the preferred design is an integral or semi integral abutment bridge. These don't have an expansion joint, thus minimizing maintenance costs, but instead you generally need deep foundations, again this is soil dependent, semi integral can be found on strip footings but is again soil dependent. Other bridge types can utilize shallow foundations but depending on the geotechnical conditions may require deep foundations. So long story short bridge type can change cost significantly just by picking one bridge type over another. This isn't something decided until detailed design which is still a ways away. Regardless soil conditions will govern the foundation type and can quickly inflate costs. ***In Ontario for large projects (bridges, infrastructure, highways) the foundation work is generally two fold. A geotechnical engineering team will be brought in to determine the surficial conditions, they will produce the factual information report regarding the soil/rock, everything one needs to design a foundation, the report may or may not include foundation recommendations. The project then goes to tender with the factual report, expected loadings (from the structural engineer) with a stipulation that the contractor retains an engineer to design the foundation based on what was provided. This moves risk to the contractor and is extremely typical of large infrastructure projects. However if a design says the contractor must use a 2.5m caisson the risk is on the engineer writing that stipulation.*** Now for our bridges it's good to understanding the surficial conditions around the bridge sites to determine what may make the foundations complicated and potentially drive up the cost. From Fairway to the Grand River bedrock is rather deep, there is minimal likelihood of having a bridge footing founded on bedrock, hence you will likely have caissons or H piles, this alone means more work and more cost. From the Grand River to Sportsworld the bedrock is shallower but still deep enough that you aren't excavating to bedrock for a footing so again likely will require caissons or H piles. Now around the Speed River and north of Eagle St where the remaining 3 bridges are bedrock is rather shallow, it is entirely possible that those bridges can be built with strip footings provided the bedrock is shallow enough that excavation isn't horrible. Obviously one would need to know the actual soil conditions before one designs something but it is certainly possible with how shallow bedrock is in that area that it could be relatively simple foundations, but again depending on the bridge type you may need to have a more complex foundation and hence more cost. For the bridge crossing Fairway and the CP tracks (10+180 to 10+690) you're looking at a 510m long bridge that would likely need to be found on deep foundations. For the bridge next to the River Rd extension (11+640 to 11+770) you're looking at a 130m long bridge through the same soils that would likely need to be found on deep foundations. For the bridge crossing the Grand River and running along 8 (12+010 to 13+480) you're looking at a 1.47km long bridge through soils that would likely require deep foundations. For the bridge crossing the Speed River (16+460 to 17+000) you're looking at 540m where bedrock is relatively shallow, so strip footings could be possible however one has to be careful about scour so you may see a mix of both even though bedrock is shallow. For the bridge crossing the CP tracks (17+650 to 18+090) you're looking at 440m on shallow bedrock so strip footings may be possible. Then the last one is the CN tracks (19+760 to 19+850) so 90m again on some shallow bedrock so strip footings could be used. Geotech Report references: Low Cut and High Fill FIDR Highway 8 widening north and south of the Grand River: FIDR Highway Low Cut/High Fill High Mast Lighting FIDR Highway 8 widening Grand River to Maple Grove: FIDR High Mast Lighting CNR Overhead @ 401 10 lane widening: FIDR CNR overhead widening Speed River Bridges @ 401 10 lane widening: FIDR Speed River Bridges Widening (Not very useful but reflects CNR overhead bedrock and OGS data) 102 Fountain Geotech (Preston Springs): CVD Preliminary Geotech Report Ontario Geological Survey Bedrock data: OGSEarth All in all it's 3.18km of bridges most are 10m (33ft) or so from the ground surface to top of track but some range up to 17m (56ft). Of which 2.11 km will likely require deep foundations to adequately support, the remaining 1.07km will likely see a mix of shallow and deep footings. So foundations alone are going to be an incredible cost. There's a reason the Preston to Galt cost estimate is 960 million less, you're avoiding 2.65 km of bridge (83% of the total Fairway to Galt bridge length). For comparisons sake the Frederick St Bridge replacement is about 30 million dollars for less than 100m, so our 3.18km of bridge would be about 950 million dollars, obviously Frederick is wider but it is way simpler in terms of not needing so many foundation elements. Or even the Roseville Rd replacement, its narrower and is about 17 million dollars for about 70 meters, so our 3.18km would be about 800 million, so again not a crazy cost estimate at all when you're looking at 17km of LRT track and catenary, 3.18 km of bridges, 2km of retaining wall, and roughly 5.4km of road reconstruction (3.4km of Hespeler, 1.3km of King St/Shantz Hill, 700m of road around Preston (side streets, King and Eagle). The Surrey-Langley SkyTrain extension is roughly 375 million per km and is entirely elevated so given ours is only 177 million per km and 20% is elevated its not an insane cost. RE: ION - Waterloo Region's Light Rail Transit - ac3r - 09-15-2025 (09-07-2025, 12:30 AM)Acitta Wrote: When I ride the ION, it is always crowded. I don't know why you say it sucked. There are European cities comparable in size to Waterloo Region that have tram systems. I don't know why you think that it can't work in Cambridge. We spend billions of dollars on roads that become clogged with traffic because we don't provide more efficient alternatives. Have you ever lived in a European country? There is nothing to compare between Canadian cities and European cities. The ION sucks because it's slow and designed to cost as little money as possible because it was the only way people were going to let the region go ahead with it. It just makes zero sense to expand it into Cambridge. Most people in that city do not want it. The city government does not want it. The majority of tax payers in the region don't want it. Increasingly, the people that did want it no longer want it. The people that do want it seem to be aware of the fact that it's a total ripoff, so now they're proposing building it in even smaller phases because six 1 billion dollar invoices is psychologically more palatable than one 6 billion dollar invoice. Or more hilariously, building an LRT in Cambridge that isn't even connected to the existing LRT...lmao. I can only hope sanity prevails and they bin this terrible idea. But if there is one thing this region excels at, it's making terrible choices. I fully expect them to spend years debating, burning through millions of dollars on studies and consultants, approve the project, then spend 15+ years dragging out the construction and inflating the bill far beyond what we can afford. RE: ION - Waterloo Region's Light Rail Transit - Acitta - 09-15-2025 (09-15-2025, 03:16 PM)ac3r Wrote:No, I have not lived in a European country. I know that they take their public transit much more seriously than car-centric Canadian cities. However, the only people who complain about better public transit are the car-brained idiots who never use it. The ION is well-used, even if it is not as well-designed as it could have been. Public transit, in general, is well-used in the Region. I know, I ride the buses and the ION. If the ION to Cambridge already existed, I would be using it regularly. Going from downtown Kitchener to downtown Cambridge is a much longer trip than going between Kitchener and Waterloo, so extending the ION really makes sense, especially with the booming population numbers in the region. Sadly, at the rate things are progressing, there is a good chance that I will be dead before it goes into operation.(09-07-2025, 12:30 AM)Acitta Wrote: When I ride the ION, it is always crowded. I don't know why you say it sucked. There are European cities comparable in size to Waterloo Region that have tram systems. I don't know why you think that it can't work in Cambridge. We spend billions of dollars on roads that become clogged with traffic because we don't provide more efficient alternatives. RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-15-2025 (09-15-2025, 03:16 PM)ac3r Wrote: But if there is one thing this region excels at, it's making terrible choices. I fully expect them to spend years debating, burning through millions of dollars on studies and consultants, approve the project, then spend 15+ years dragging out the construction and inflating the bill far beyond what we can afford. And you think the region is worse in that regard than, say ... Toronto? Seriously? RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-15-2025 (09-15-2025, 04:12 PM)Acitta Wrote:(09-15-2025, 03:16 PM)ac3r Wrote: Have you ever lived in a European country? There is nothing to compare between Canadian cities and European cities. The ION sucks because it's slow and designed to cost as little money as possible because it was the only way people were going to let the region go ahead with it. I grew up in Europe and have lived there for long stretches since then. And I have spent close to two years in Japan, too. The key underlying factor is that European cities generally are, and generally always have been, much more urban than North American cities. As a result, they are far less car-centric, and far more people walk, cycle and take transit--and the same is true in Japan as well. You hate that fact that the LRT is above ground, but LRT and tram systems are common in Europe as well. But it is indeed driving both ridership and development, roughly meeting its original goals (COVID-19 impacted it along the way). I don't see any point in arguing this with you any further as there is no way to have a reasoned debate with you on this topic. RE: ION - Waterloo Region's Light Rail Transit - creative - 09-15-2025 … or any other topic! |