Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179


RE: ION - Waterloo Region's Light Rail Transit - Acitta - 09-07-2025

(09-06-2025, 09:33 PM)ac3r Wrote: The best idea is to just scrap the past idealistic ION light rail idea the region had when it began. The world has drastically changed since then and there is no longer the need for the same project idea they had in 2010-2015 to be built today. It is obviously going to be a waste of money which we don't even have in the first place. The ION ultimately sucked, I think everyone can agree with that these days. Nobody cares about whether it was the best "bang for the buck" because it's just objectively bad. You're wrong if you disagree.

What needs to happen to deal with Cambridge is for the region to look at the transit from a fresh perspective. Them contemplating whether or not it makes any sense to build is a start. In fact, in my experience the fact they brought that up is them saying it's never going to happen anytime soon. It makes no sense to spend billions of dollars to run an LRT to a small suburban city of not even 140'000 people in which the majority of its population are not in favour of rapid urbanization of their community. That's fine and you can't force that. Fill the need by improving BRT because obviously the 302 route is obviously something people demand. Buses are thankfully really flexible.

Put money into BRT and put money into improving the existing LRT with things like faster frequency/headways, finally coupling the damn trains together and exploring ideas for future extensions - and an inevitable route to Cambridge. Things that will actually benefit people. Nobody is benefitting from burning 1, 2, 3, 4, 5 billion dollars on a project that'll take 15 years to finish and go way over budget, only for people to end up being extremely disappointed in the same way regional residents were disappointed in the existing LRT after all is said and done.

There are much better ways to improve transit between Cambridge and the rest of the region which don't include forcing a multi-billion dollar bill upon people.
When I ride the ION, it is always crowded. I don't know why you say it sucked. There are European cities comparable in size to Waterloo Region that have tram systems. I don't know why you think that it can't work in Cambridge. We spend billions of dollars on roads that become clogged with traffic because we don't provide more efficient alternatives.


RE: ION - Waterloo Region's Light Rail Transit - KevinL - 09-07-2025

The Ion is a grand success in both its main goals - improving transit and intensifying development. Anyone who can't see that on the face of it just isn't able to observe the world around them.

Are there bigger challenges getting to Cambridge? Are we certain we'll see the same degree of success there? Those are points worth discussing. But saying the existing system is a failure is a bald-faced lie.


RE: ION - Waterloo Region's Light Rail Transit - bravado - 09-07-2025

(09-05-2025, 02:20 PM)cherrypark Wrote: At this point just do the BRT for less, hope that GO to Cambridge gets approved, and live to fight for whatever Phase 3 would have been within KW.

If the policy of some is "let's cheap out on Cambridge so we can do the nice thing in KW later", then this Region is cooked politically. City-building for me, but not for thee. I can't adequately explain how insulting this is - as if a few bridges over flat, seismically-stable land is akin to building a new Ancient Wonder of the World. But I get it, wealthy tech and university people need their train and the more modest working people on Hespeler Road should just settle for a bus because they don't deserve the same as us. If only they took the effort to go to public meetings at 2PM on a tuesday like us! They don't deserve the same clean train as others because they made the mistake of trying to start their life and buy a house in the wrong year and in the wrong city.

All of North America can't do public procurement anymore. If Phase 2 is twice as expensive as it should be, then Phase 3 will be too. As will the next hospital, and school, and highway widening - but the bill for those doesn't really get local headlines so nobody talks about it - only transit. Fuck, they're keeping the bill for Highway 413 secret so we can keep fighting for the scraps in the transit world while the suburbanites get blank cheques for whatever they like.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 09-07-2025

I don't think anyone is saying Cambridge residents don't 'deserve' a train. The question is whether that is the best use of resources to serve a population like Camrbidge - both an extremely NIMBY populace and one that historically dislikes expansion AND one that is awkwardly spread out (maybe I haven't visited enough places in Canada). Hespeler road is like 'off the interstate 95' town vibes to be honest. Could a LRT change it? Maybe, but i dont see where homes and density could fit there, as a by product of bringing in a LRT.

How about Cambrisge come to the table and bring the fresh ideas? Along with some perspective on improving the homeless issue there.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-08-2025

(09-07-2025, 12:59 PM)bravado Wrote:
(09-05-2025, 02:20 PM)cherrypark Wrote: At this point just do the BRT for less, hope that GO to Cambridge gets approved, and live to fight for whatever Phase 3 would have been within KW.

If the policy of some is "let's cheap out on Cambridge so we can do the nice thing in KW later", then this Region is cooked politically. City-building for me, but not for thee. I can't adequately explain how insulting this is - as if a few bridges over flat, seismically-stable land is akin to building a new Ancient Wonder of the World. But I get it, wealthy tech and university people need their train and the more modest working people on Hespeler Road should just settle for a bus because they don't deserve the same as us. (...)

Far too many posts for me, but as far as I recall, the interest in LRT among the Cambridge mayor and council was on the low side for quite a long time. Doug Craig voted against the LRT in the first place, did they not? And the Cambridge council rejected at least one of the Phase 2 plans. So, I do think part of this is frustration with Cambridge, too.


RE: ION - Waterloo Region's Light Rail Transit - bravado - 09-08-2025

It really shouldn't be a shock that a city without university students + the extended community around them isn't really accepting of urbanism. Cambridge's selfish and ancient council is no different than any sprawling Ontario city. I don't want to defend their rampant small-mindedness, but the messaging that people get from KW really couldn't be more condescending and dismissive, so why would they bother taking a political risk on something new and expensive?

KW has no shortage of NIMBY councillors and mayors and local business leaders who tried their best to kill Phase 1, and I'd say that most people in the vast majority of the city that isn't served by Phase 1 still treat it (at best) with derision.

The point is that I didn't choose the city that I put down roots in - nobody in my generation has been able to make that choice. If Cambridge doesn't get Phase 2, then KW will have a sprawling tumour, full of resentment and financial liabilities, attached to it for the next century. I'm angry that leadership doesn't see that but I'm not surprised - the bar couldn't be lower.

I've also seen lots of comments from local activists and councillors and businesses in favour of Phase 2 - but it all gets drowned out in the endless negativity that surrounds local issues.


RE: ION - Waterloo Region's Light Rail Transit - bravado - 09-08-2025

Anyways I think if Phase 1 was proposed today, it would never have been built. It genuinely seems like nobody has the political capacity to do anything.

It seems like the best possible outcome is jamming through something that "the voters" (20%) don't like, building it anyways, and then everyone forgets how much they hated it once its built and running fine. Not my favourite option - but no alternatives exist in our current cultural political leadership vacuum.


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 09-09-2025

Smaller chunks at a time may be more palatable to the electorate and government plus allow for quicker implementation of each segment. Bringing on more ridership in these areas would be a good demonstration of the need to continue to lengthen it into Cambridge. The Region may have an easier time presenting the cases to the upper levels of government and could come in with smaller requests each time. The project doesn't need to be a monolith. Rapid transit construction used to follow this approach, adding a station or two continuously rather than building an entire line at once.

Potentially phase it as follows.
1. Fairway to Sportsworld - Almost to Cambridge. Allows for a good connection to GO/Intercity Buses, Commuter lot. Move the bus facility from beside YE's sushi to the area where the foundations for future buildings in Sportsworld crossing were poured and later removed.
2. Sportsworld to Pinebush - Serves Preston and the Pinebush Node/Potential GO station. Another place where we can use the system for connectivity to other modes of transport.
3. Pinebush to Delta - Almost gets into the heart of Galt, serves Cambridge Centre and the Delta. Another good potential point for additional connectivity.
4. Delta to Ainslie - this only makes sense if there is still a terminal at Ainslie, I would expect Cambridge to move more towards a spine after LRT is implemented.


RE: ION - Waterloo Region's Light Rail Transit - dunkalunk - 09-09-2025

(09-09-2025, 08:31 AM)Mneonjoe Wrote: Smaller chunks at a time may be more palatable to the electorate and government plus allow for quicker implementation of each segment. Bringing on more ridership in these areas would be a good demonstration of the need to continue to lengthen it into Cambridge. The Region may have an easier time presenting the cases to the upper levels of government and could come in with smaller requests each time. The project doesn't need to be a monolith. Rapid transit construction used to follow this approach, adding a station or two continuously rather than building an entire line at once.

Potentially phase it as follows.
1. Fairway to Sportsworld - Almost to Cambridge. Allows for a good connection to GO/Intercity Buses, Commuter lot. Move the bus facility from beside YE's sushi to the area where the foundations for future buildings in Sportsworld crossing were poured and later removed.
2. Sportsworld to Pinebush - Serves Preston and the Pinebush Node/Potential GO station. Another place where we can use the system for connectivity to other modes of transport.
3. Pinebush to Delta - Almost gets into the heart of Galt, serves Cambridge Centre and the Delta. Another good potential point for additional connectivity.
4. Delta to Ainslie - this only makes sense if there is still a terminal at Ainslie, I would expect Cambridge to move more towards a spine after LRT is implemented.

Can't agree more. More phasing, smaller pieces, local team building local expertise, continuous incremental expansion. This is how we get it done. We're past needing to do a big spend to have a minimum viable system at this point. We can continue to grow what we have.


RE: ION - Waterloo Region's Light Rail Transit - KevinL - 09-09-2025

Indeed, and after (or even during) the above phased work we can add new branches and/or full lines in KW to keep growing the network.


RE: ION - Waterloo Region's Light Rail Transit - nms - 09-09-2025

From a practical point of view, what's the smallest phase that could be built and commissioned with it still making sense? Station by station (say 1km apart)? Or is the whole system complex enough that multiple stations or stretches would need to be done (say 5km at a time). If the Region had developed a local ecosystem of contractors who could work on this project, I could foresee a decade long plan that saw the system grow incrementally in various directions rather than waiting for one big stretch at a time.


RE: ION - Waterloo Region's Light Rail Transit - ZEBuilder - 09-10-2025

(09-09-2025, 10:26 PM)nms Wrote: From a practical point of view, what's the smallest phase that could be built and commissioned with it still making sense?  Station by station (say 1km apart)?  Or is the whole system complex enough that multiple stations or stretches would need to be done (say 5km at a time).  If the Region had developed a local ecosystem of contractors who could work on this project, I could foresee a decade long plan that saw the system grow incrementally in various directions rather than waiting for one big stretch at a time.

With where the Region wants an east-west line (Ottawa) there isn't really an easy option to build it in phases at least initally. This is mainly due to how it would interconnect with phase 1. At Mill you would need a grade separation because of the CN tracks, unless you work out something with CN to not have trains during the day. Which effectively means an underground or above ground station to adequately interconnect with phase 1 at Mill. Then you have to figure out the Alpine and Homer Watson roundabouts. Going east you'd need to figure out where you're coming back above ground or below ground after Mill and are you interconnecting with Borden? After Weber it can easily be phased same thing with going west from Alpine.

A Victoria route needs to wait on the MTO so that can't be built at least soon, and again how are you crossing the spur past Park St and how are you dealing with crossing the tracks at King.

A University route is likely the simplest but again how are you dealing with crossing phase 1.

Once we get to Cambridge it's certainly possible to build it in phases but you really need to get to Pinebush before that makes sense.

So it does really depend on mainly how Line 1 is interconnected with how a cross town line is built in terms of how many km could be built at a time. It would certainly build up our local contractors wealth of knowledge (Capital, Steed and Evans, Musselman, Cox?, and Regional?).


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 09-10-2025

(09-10-2025, 07:16 AM)ZEBuilder Wrote:
(09-09-2025, 10:26 PM)nms Wrote: From a practical point of view, what's the smallest phase that could be built and commissioned with it still making sense?  Station by station (say 1km apart)?  Or is the whole system complex enough that multiple stations or stretches would need to be done (say 5km at a time).  If the Region had developed a local ecosystem of contractors who could work on this project, I could foresee a decade long plan that saw the system grow incrementally in various directions rather than waiting for one big stretch at a time.

With where the Region wants an east-west line (Ottawa) there isn't really an easy option to build it in phases at least initally. This is mainly due to how it would interconnect with phase 1. At Mill you would need a grade separation because of the CN tracks, unless you work out something with CN to not have trains during the day. Which effectively means an underground or above ground station to adequately interconnect with phase 1 at Mill. Then you have to figure out the Alpine and Homer Watson roundabouts. Going east you'd need to figure out where you're coming back above ground or below ground after Mill and are you interconnecting with Borden? After Weber it can easily be phased same thing with going west from Alpine.

A Victoria route needs to wait on the MTO so that can't be built at least soon, and again how are you crossing the spur past Park St and how are you dealing with crossing the tracks at King.

A University route is likely the simplest but again how are you dealing with crossing phase 1.

Once we get to Cambridge it's certainly possible to build it in phases but you really need to get to Pinebush before that makes sense.

So it does really depend on mainly how Line 1 is interconnected with how a cross town line is built in terms of how many km could be built at a time. It would certainly build up our local contractors wealth of knowledge (Capital, Steed and Evans, Musselman, Cox?, and Regional?).

You can build a disconnected segment in Cambridge to connect meaningful destinations (and that probably also has the highest ridership opportunities anyway). But then you must duplicate all the storage and maintenance facilities.


RE: ION - Waterloo Region's Light Rail Transit - Kodra24 - 09-11-2025

I'm definitely in favour of extending the LRT to Cambridge - the sooner the better (and I don't even ride it)

Many good points and possibilities raised here, hopefully something does materialize


RE: ION - Waterloo Region's Light Rail Transit - bravado - 09-11-2025

Incremental building has the added benefit of letting people use it, get used to it, and eventually get over their fear/hate responses gradually.

We all know this phenomenon. Propose something new, get instant backlash, build it anyway, and then nobody remembers what life was like before.

It’s a problem with our system but I feel like it’s not possible to convince people about almost any new proposal. Political minds don’t seem to change, regardless of the good faith arguments presented. You can have an argument about new transit that objectively reduces congestion and raises tax revenue, and people will still never get over their initial reaction.