![]() |
|
Ottawa LRT - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Connected Café (https://www.waterlooregionconnected.com/forumdisplay.php?fid=15) +--- Forum: Outside Waterloo Region (https://www.waterlooregionconnected.com/forumdisplay.php?fid=33) +--- Thread: Ottawa LRT (/showthread.php?tid=589) |
RE: Ottawa LRT - tomh009 - 01-26-2018 (01-25-2018, 11:28 PM)Pheidippides Wrote:(01-25-2018, 04:34 PM)tomh009 Wrote: Which secrecy are you referring to? That they have not yet announced a new date? Or something else? I expect that the city staff will take the consortium's date and then build their own schedule based on that. That'll take some time, but they will not want to announce any schedule revisions prematurely. RE: Ottawa LRT - Pheidippides - 02-10-2018 Why did the city let the LRT consortium off the hook for $1M? City officials, including mayor, have been wily about — or didn't know — what contract says Another example of why P3s aren't always as great as they are made out to be. RE: Ottawa LRT - Canard - 02-10-2018 Any contract could seem bad if you don't understand the terms. In other news, the entire system is not going to be ATO/Automated as was first thought. As it turns out, the driver will operate the train just like any other train for almost the entire line - only in the tunnels for 3 stations will it be ATO (push start button). RE: Ottawa LRT - tomh009 - 02-10-2018 (02-10-2018, 01:55 PM)Pheidippides Wrote: Why did the city let the LRT consortium off the hook for $1M? It being a P3 is not the fundamental problem. Not managing the project properly is the problem. If you negotiate a good contract and you manage it well, P3 can work just fine. The same is true for any private company outsourcing a project: managed badly, it will be a disaster, managed well, it can be as good as or better than doing the project internally. And, yes, if you don't have the desire or capability to manage the outsourcing project, you simply shouldn't do it. RE: Ottawa LRT - Canard - 02-17-2018 Chris Drew has created a facebook event to plan opening day! https://www.facebook.com/events/1889361594438948/?ti=icl RE: Ottawa LRT - Canard - 02-25-2018 Since nobody else has posted it yet, Ottawa revealed the names of their trains. Article from CBC I wasn't going to look until I was physically there (I like surprises!), but my husband said "...no, you've got to see these".
The existing Trillium Line (DMU) vehicles will also get names:
I'll refrain from commenting on individual names but there are some really good ones and some really bad ones, so I think that's great. It's like an art gallery - it's supposed to have stuff you like and stuff you hate. Makes for good discussions on the platforms.
RE: Ottawa LRT - tomh009 - 02-25-2018 There are some good ones (I particularly like Rocket Richard) but I would prefer a theme. Most of them are named after people, but then there is a smattering of miscellaneous other stuff thrown in. Can we get one called "Red Hot"?
RE: Ottawa LRT - KevinL - 02-25-2018 Dutch Treet? Mini-Sizzler? RE: Ottawa LRT - Canard - 03-01-2018 Bikes OK on LRT - Ottawa Citizen RE: Ottawa LRT - Canard - 03-06-2018 LRT consortium won't take blame for Rideau Street sinkhole - CBC Neat-o blame-slider thingie at the bottom of the page. Fun! RE: Ottawa LRT - Pheidippides - 04-03-2018 Kind of puts some of our testing milestones for our "late spring" opening in perspective relative to Ottawa's November 2018 opening. Make-or-break testing to begin on Confederation Line RE: Ottawa LRT - plam - 04-03-2018 (04-03-2018, 10:41 PM)Pheidippides Wrote: Kind of puts some of our testing milestones for our "late spring" opening in perspective relative to Ottawa's November 2018 opening. Does anyone (like trainspotter139) know how automated our trains are going to be compared to Ottawa's? RE: Ottawa LRT - Canard - 04-25-2018 Gobs of footage today out of Ottawa:
Can't wait for Tom (Galloway) to get his chance to do the same here.
RE: Ottawa LRT - jeffster - 04-26-2018 (04-25-2018, 09:37 PM)Canard Wrote: Gobs of footage today out of Ottawa: That's assuming he's re-elected. Interesting too, and while I am not sure if Ottawa is behind schedule or not, is that they have the trains ready before everything else is complete. That's how it should be done. Now they can do months of testing too. We're not likely to get all the trains before the end of this year, plus they should do enough testing (likely 6 months with all trains). Ottawa went with Alstom, and they build both the train and signalling, and apparently on time as well. The trains originate in the US, but final assembly was in Ottawa. I'm thinking if the region gets our second phase LRT, just have a transfer point at Fairview Park or Sportsworld, then use Alstom trains for the rest of the Blue Line to Cambridge. Saves a lot of headaches. Plus with final assembly in the region, it means more jobs! RE: Ottawa LRT - tomh009 - 04-26-2018 Ottawa LRT is currently six months behind schedule. And they can only test on part of the system until some months later. Incidentally, in Ottawa RTG will not be paying any penalties at all for missing the schedule. |