Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 13 Vote(s) - 3.85 Average
  • 1
  • 2
  • 3
  • 4
  • 5
General Urban Kitchener Updates and Rumours
Does anyone know where to find site plans that have been submitted to the city? Are these not included in the open data records?

There's many developments whose site plans can be found in council meeting records etc. For the ones that aren't, records of the site plans being approved can be found in the open data, with notes like "(See plan drawings)", but the drawings arent anywhere to be found.

For example, I can see in building permits the following (Station Park):

Code:
OBJECTID    ‎55102
Parcelid    ‎50006688
Permitno    20105900
Folderrsn    ‎579035
Permit Type    Residential Building (Multi)
Permit Type Code    RM
Roll No    301205000106103
Foldername    641 KING ST W
Legal Description    PLAN 377 LOTS 67 TO 73 AND 109 PT LOTS 22 TO 30 AND 489 STREETS AND LANES LOT 112 PT LOT 32 RP 58R-3202 PT PART 1 RP 58R-3390 PT PART 5 RP 58R-3594 PT PART 1 RP 58R-19198 PARTS 1 TO 3
Permit Status    Issued
Status Code    20
Application Date    February 10, 2020
Issue Date    December 29, 2020
Final Date    
Expiry Date    
Issue Year    ‎2020
Issued By    MATTRU
Sub Work Type    Apartment
Work Type    New Construction
Work Code    ‎1
Permit Description    Permit is for Balance of Construction for a residential apartment building - Tower A (20 storeys) and Tower B (29 storeys), including a shared podium and three level underground parking garage - Inclu
Construction Value    ‎128000000
Total Units    0
Units Created    583
Units Lost    
Units Net Change    ‎583
Rear Yard Rqrd    
Left Side Yard Rqrd    
Right Side Yard Rqrd    
Special Conditions    See notes on drawings. Plumbing work to be carried out by a Plumbing Contractor Licensed by The City of Kitchener. All work shall comply with the 2012 Building Code Work permit required when working within a municipal road allowance/right of way, roadway, boulevard, or sidewalk area. Contact Transportation Planning at 519-741-2200 x 7373 for more information. Applicant's responsibility to provide set of approved permit drawings on site at all times Fire Safety Plan to be submitted to Fire Prevention Staff prior to occupancy.
Owners    
Applicant    MAURICIO MIRANDA :VANMAR DEVELOPMENTS
Contractor    VANMAR CONSTRUCTORS
Contractor Contact    145 GODDARD CRES CAMBRIDGE ON N3E 0B1 phone 519-- phone2 519--
Extraction Date    October 12, 2021
Permit Fee    ‎679220.25
Statcangrossarea M2    
Existing Gfa M2    
Proposed Gfa    
Total Gfa M2    
Occupancy Permitted Dt    
Rowhouse Units Created    
Storeys Proposed    Tower A = 20 Storey; Tower B = 29 Storey
Gfa Groupc Constr Sqft    
New Floor Area Sqft    638504
GlobalID    3efa9488-0e37-4d75-86b1-46c433480343

However, no drawings, as it mentions under "Special Conditions".

There's also a listing of the status of all site plan applications, wherein there is the following:

Code:
SP21/082/K/BB    BRIANBA    Proposing Phase 2 of the Station Park development which includes the development of two towers (Buildings C and D) which will share one podium and contain commercial uses at ground level. The proposed building(s) are above 3 levels of underground parking  and the area of Phase 2 includes the development of a portion of the future urban square.    MHBC PLANNING LTD ANDREA SINCLAIR    641    KING ST W      Sep 01 2021    Under Review    9

for the next 2 towers of Station Park (currently under review, submitted on Sept 1st). Though these plans are found anywhere either. Should these not be hosted somewhere? Am I missing them?
Reply


« Next Oldest | Next Newest »



Messages In This Thread
RE: General Urban Kitchener Updates and Rumours - by GtwoK - 10-13-2021, 08:30 PM
RE: Mayfair Hotel - by Markster - 06-09-2015, 03:36 PM
RE: Mayfair Hotel - by KWchick - 06-09-2015, 03:43 PM
RE: Mayfair Hotel - by panamaniac - 06-09-2015, 03:51 PM
RE: Mayfair Hotel - by KWchick - 06-09-2015, 03:53 PM
RE: Mayfair Hotel - by tomh009 - 06-09-2015, 04:02 PM
RE: Mayfair Hotel - by LakesidePark - 06-10-2015, 07:34 AM
RE: Mayfair Hotel - by BuildingScout - 06-12-2015, 09:47 AM
RE: Mayfair Hotel - by tomh009 - 01-16-2023, 09:09 PM
RE: Mayfair Hotel - by CedarHillAlum - 01-17-2023, 03:55 PM
RE: Mayfair Hotel - by Owen - 06-12-2015, 10:17 AM
RE: Mayfair Hotel - by panamaniac - 06-12-2015, 10:27 AM
RE: Mayfair Hotel - by neonjoe - 06-12-2015, 10:57 AM
RE: Mayfair Hotel - by tomh009 - 06-12-2015, 11:58 AM
RE: Mayfair Hotel - by tomh009 - 06-12-2015, 12:10 PM
RE: Mayfair Hotel - by BuildingScout - 06-12-2015, 12:17 PM
RE: Mayfair Hotel - by panamaniac - 06-12-2015, 02:47 PM
RE: Mayfair Hotel - by Owen - 06-12-2015, 03:11 PM
RE: Mayfair Hotel - by plam - 06-12-2015, 07:27 PM
RE: Mayfair Hotel - by mpd618 - 06-12-2015, 09:15 PM
RE: Mayfair Hotel - by DHLawrence - 06-12-2015, 09:43 PM
RE: Mayfair Hotel - by Owen - 06-15-2015, 10:38 AM
RE: Mayfair Hotel - by BuildingScout - 06-15-2015, 10:53 AM
RE: Mayfair Hotel - by panamaniac - 06-15-2015, 11:24 AM
RE: Mayfair Hotel - by mpd618 - 06-15-2015, 04:15 PM
RE: Mayfair Hotel - by REnerd - 06-15-2015, 09:54 PM
RE: Mayfair Hotel - by Owen - 06-15-2015, 10:03 PM
RE: Mayfair Hotel - by tomh009 - 06-15-2015, 10:31 PM
RE: Mayfair Hotel - by Section ThirtyOne - 06-16-2015, 11:36 AM
RE: Mayfair Hotel - by Owen - 06-16-2015, 11:41 AM
RE: Mayfair Hotel - by Section ThirtyOne - 06-16-2015, 11:51 AM
RE: Mayfair Hotel - by Owen - 06-16-2015, 12:32 PM
RE: The Glove Box | 6 fl | Proposed - by Spokes - 11-02-2018, 08:53 AM
RE: The Market Flats | 7 fl | Completed - by ac3r - 01-10-2023, 12:50 PM
RE: The Market Flats | 7 fl | Completed - by ac3r - 01-10-2023, 02:06 PM

Forum Jump:


Users browsing this thread: 37 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links